Title Page
-
Conducted on
-
Location
-
Scheme
-
Team Leader
-
Personnel on site
1.0 Site Documentation and Arrangements
-
Construction Phase Plan available and up to date
-
Risk Assessments and Method Statements in date and appropriate for activities undertaken
-
First Aid kit present, well stocked and in date
-
Fire Extinguisher present, in date and appropriate
-
Operatives aware of fire procedure - raising alarm, assembly point etc.
-
Eye Wash present, stocked and in date
-
COSHH Assessments available and in date
-
Hazardous Substances stored and disposed of correctly
-
Adequate welfare arrangements in place?
-
Vehicle(s) parked safely near work location, keeping pedestrian and vehicle routes clear
-
Tools stored safely in vehicles
-
Pre-start check completed for WDH vehicles
2.0 Housekeeping
-
Materials safely stacked and stored
-
Access and egress routes free of obstruction
-
No trailing cables / leads
-
No spills - if no, how have they been cleaned up?
3.0 Manual Handling
-
Operatives trained to lift safely?
-
Safe manual handling techniques observed (assisted lifts for +25kg loads?)
-
Mechanical aids available and used appropriately?
4.0 PPE
-
Correct PPE / RPE worn / used appropriately for task?
-
Operatives aware of PPE / RPE replacement procedure?
-
PPE / RPE stored away correctly to prevent contamination?
5.0 Access Platforms
-
Access Platforms used?
- Ladders
- Step ladders
- Podiums
- MEWP
- None
-
Suitable for task and of industrial quality (class 1)
-
Tagged in date and in good condition
-
Secured / anchored correctly to prevent slippage and resting on a solid surface
-
Platform sited to prevent over-reaching
6.0 Work at Height - Scaffold system used?
-
Scaffold system used on site? If so, what type?
- Fixed Scaffolding
- Tower Scaffolding
- None
-
Scaffold erected, altered and dismantled by competent person (CISRS)
-
Inspected, tagged appropriately and up to date
-
Base plates, standards, ledgers, braces and struts in correct position
-
Toe boards, guard rails, brick guards and ladder gates in correct position
-
Foam protection in place where appropriate
-
Ladders in good condition, securely planted to firm ground and tied correctly to both stiles
-
Outriggers deployed, wheels locked and platform empty when tower is moved
-
Used correctly and operatives PASMA trained (Tower)
7.0 Asbestos
-
Asbestos containing materials identified as per surveys
-
ACMs identified removed by licensed professional
-
Operatives Asbestos Awareness trained
8.0 Noise and Vibration
-
Noise protection worn as required (RAMS)
-
People not involved in work kept safely away from noisy working areas
-
Operatives aware of HAVs Exposure limits for their equipment and tools (how long they can use for over 8hr work period)
9.0 Tools and Equipment
-
All equipment PAT tested (quarterly)
-
RCD / 110v used when necessary
-
Work equipment checked and recorded according to PUWER (weekly)
-
Tools and equipment in good order, used by competent person
10.0 Excavations
-
Excavations conducted?
-
Adequate trench support
-
Safe access and egress in place
-
Barriers erected with warning signs to deter people and materials from falling in
-
Stop blocks in place to prevent vehicles falling in
-
Frequent inspections conducted and recorded including gas monitoring
-
Excavated arising safely stockpiled
-
Excavations not affecting neighbouring buildings and structures (any tell tale signs of new subsidence)
11.0 LOLER
-
Lifting operations and lifting equipment?
-
Competent persons (Slinger/Signaller, Banksman, Crane/Plant Operator/Supervisor)
-
Lift plan available, appropriate and safe system of work adhered to
-
Thorough examinations for lifting equipment and accessories as per LOLER
-
Segregation of operatives / members of public from lifting area
-
Checklist completed for mobile crane, tele handler and excavators
12.0 Other
-
Apprentices working safely and appropriately supervised
-
No other issues to record
-