Title Page

  • Site Name

  • Conducted on

  • Prepared by

  • Location
  • Site security and sign in procedures in place<br>

  • Operatives have been signed up to the RAMS

  • Toolbox talks undertaken with evidence of talk given

  • Pedestrian walkways are clearly marked and in place.

  • Site Welfare Facilities in good order

  • Correct PPE being worn on site be Wealden Operatives

  • Materials loaded out in a safe manner

  • Are operatives working at height Safely?

  • Work areas left clean and tidy?

  • Relevant skips used for waste disposal?

  • Mortar silo area kept clean and tidy?

  • Mortar bins in good condition?

  • Are their regular fire points around the site?

  • Ground condition acceptable?

  • Is there a first aid box on site?

  • Operative demonstrating good manual handling?

  • Are there any other safety concerns

Working at Height

  • Is scaffold in good order?

  • Are correct Platforms in place for specific working activities?

  • Is edge protection in place, internal and external?

  • Conditions applicable to the submission of this audit report. 1. Every reasonable care is taken in the compilation of this report, but liability cannot be accepted for errors or omissions which occur in uninspected areas or with unseen equipment or materials, during any operations which were not being conducted at the time of the inspection, or due to misinformation. 2. Clearly obvious hazards are noted in the report, but risk from unforeseeable, unnotified or less evident hazards may still occur. There is no implication in the report that such hazards do not exist. 3. Reports on all items of access are based only on visual inspection. There is no implication whatsoever that the design thereof must be adequate as this is a matter for suppliers and those issuing certificates. 4. A full and detailed inspection of any fixed scaffold or other access to comply with the requirements of Regulation 12 of the Working at Height Regulations (2005) has not been made during this inspection. This report details any obvious defects noted during the inspection process but others might remain. If the client requires such an inspection, then this must be carried out separately. 5. This report is passed to the client for action as they see fit. No further actions will be taken by the compiler of the report without authority of the management .

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.