Information

  • Area/Zone

  • Supervisor in charge

  • Conducted on

  • Prepared by

  • Personnel involved with inspection

  • Document No.

  • Based on 025-F002-2595 (rev 0)

General site photos

Overview of the site

  • Theses photos should provide an overview of the work area being inspected. Elements to be captured could include, activities or subbies working in the area, site boundaries showing sediment controls in place, general work areas showing bins, spill kits etc.

  • General site photos

  • Site photos
  • Site photo

  • Description of site photo

Positive and negative site behaviours

  • Take photos showing general positive behaviours around the site. For example good examples of sediment and erosion controls etc

  • Behaviour

  • Behaviours
  • What type of behaviour is being shown

Air Emissions

  • Activity being undertaken is appropriate given wind conditions

  • Dust is being controlled

  • Trucks covered when transporting dry material off-site

  • Odours are not migrating off-site

  • Need to add new action items relating to air emissions

  • New action item relating to air emissions

  • Air emission action
  • Description of action required

  • Due date for action item

  • Who is responsible for closing out the action item

  • What needs to happen with this action item?

Vibration

  • Is vibration an issue at this site

  • Are piling activities being undertaken or high risk activities being carried out within 30m of cultural heritage locations

  • If yes is vibration monitoring being carried out?

  • Is the monitor adequately protected from the public

  • Need to add new action items relating to vibration

  • New action item relating to vibration

  • Vibration action
  • Description of action required

  • Due date for action item

  • Who is responsible for closing out the action item

  • What needs to happen with this action item?

Noise Emissions

  • Are works being carried out between 5.30pm and 6.30am (ie night works)

  • Is an approved out of hours permit in place

  • Is noisy equipment orientated to avoid nuisance to neighbours

  • Is all plant, equipment and vehicles fitted with squawker type reversing alarms

  • Need to add new action items relating to noise emissions

  • New action item relating to noiseemissions

  • Noise emission action
  • Description of action required

  • Due date for action item

  • Who is responsible for closing out the action item

  • What needs to happen with this action item?

Erosion and Stormwater Management

  • ERSED control plan being implemented

  • No signs of erosion on site

  • No sign of sediment leaving site<br>

  • Sediment and erosion controls are being maintained

  • Are ERSED controls correctly installed

  • Need to add new action items relating to sediment and erosion controls

  • New action item relating to sediment and erosion

  • Sediment and erosion action
  • Description of action required

  • Due date for action item

  • Who is responsible for closing out the action item

  • What needs to happen with this action item?

Land Contamination

  • Is the site free from contamination

  • Are the works in an Acid Sulphate Soil area

  • ASS being managed as per EPI

  • Need to add new action relating to land contamination

  • New action item relating to land contamination

  • Land contamination action
  • Description of action required

  • Due date for action item

  • Who is responsible for closing out the action item

  • What needs to happen with this action item?

Water Quality

  • Is water quality being monitored

  • Is the site discharging water

  • Are water discharges being monitored

  • Discharges are not impacting on receiving waters

  • Need to add new action relating to water contamination

  • New action item relating to water contamination

  • Water contamination action
  • Description of action required

  • Due date for action item

  • Who is responsible for closing out the action item

  • What needs to happen with this action item?

Chemical Management and Hazardous Materials Storage

  • Are fuels, chemicals or hazardous substances used or stored on site

  • Are fuels, chemical, and hazardous materials stored in bunded areas

  • Are bunds free of water and debris

  • Are all containers in good condition, with closed valves/secured tops

  • Are containers clearly labelled

  • Are waterways and drains protected from potential spills

  • Are spill kits available, sufficient for activities and fully stocked

  • Need to add new action relating to chemicals and fuels

  • New action item relating to chemicals

  • Chemical action
  • Description of action required

  • Due date for action item

  • Who is responsible for closing out the action item

  • What needs to happen with this action item?

Refueling, Maintenance and Parking of Plant and Machinery

  • Has a designated area been established for refueling, maintenance and parking

  • Is the area appropriate (ie away from watercourses/drains, ground that limits land contamination, etc.)

  • Is plant well maintained<br><br><br>

  • Need to add new action relating to refuelling, maintenance and parking of plant

  • New action item relating to plant and equipment

  • Plant action
  • Description of action required

  • Due date for action item

  • Who is responsible for closing out the action item

  • What needs to happen with this action item?

Waste Management

  • Are bins of sufficient size for construction waste and are they being emptied regularly enough

  • Are materials being segregated for recycling

  • Are putrescible bins free of vermin and covered

  • Are regulated wastes segregated from other waste streams

  • Are concrete wastes being disposed of in designated and lined washout areas

  • Need to add new action relating to waste management

  • New action item relating to waste management

  • Waste management action
  • Description of action required

  • Due date for action item

  • Who is responsible for closing out the action item

  • What needs to happen with this action item?

Flora, Fauna, Weed and Pest Management

  • Have all environmentally significantly areas been clearly marked on site

  • Is clearing to be undertaken in this area

  • Are the limits of clearing or tree removal adequately identified

  • Are tree protection zones in place

  • Has all new plant and machinery been inspected for weeds prior to mobilization to site

  • Are weeds being managed

  • Are disturbed areas being progressively rehabilitated

  • Are fire ants being managed as per the EPI?

  • Need to add new action relating to flora and fauna

  • New action item relating to flora and fauna

  • Flora and fauna action
  • Description of action required

  • Due date for action item

  • Who is responsible for closing out the action item

  • What needs to happen with this action item?

Community and Cultural Issues Management

  • Have all sites of known cultural significance been identified and protected

  • Have areas of heritage discoveries been protected by fencing or flagging

  • Need to add new action relating to community and cultural issues

  • New action item relating to community and cultural heritage

  • Community and cultural heritage action
  • Description of action required

  • Due date for action item

  • Who is responsible for closing out the action item

  • What needs to happen with this action item?

General observations and other action items

Other issues noted on site

  • Other issues noted on site

  • Additional issue
  • Description of issue - click on question to add details of issue and add picture

  • Does this issue need to be addressed with an action item

  • Add details of New Action Items

  • Add action items
  • Has the action item already been closed out

  • Does this need to be added to the commitment register

Documentation Review

JSEA Review

  • JSEA Reviewed

  • Have all workers signed onto it

  • Has it been approved by Macdow personnel

  • Have all the environmental hazards been identified

  • Are the listed environmental controls appropriate

  • Have the listed environmental controls been implemented as per the JSEA

SEP Review

  • SEP Reviewed

  • Is the SEP still relevant and up to date for the works being carried out

  • Have the environmental controls been implemented as per the SEP

Worforce Engagement and Site Behaviours

Workforce Engagement

  • Did you engage with the workforce during the inspection?

Positive site behaviours

  • Please note down positive site behaviours that should be recognized.

  • Positive behaviours

Signoff

  • Name of advisor

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.