Title Page
-
Jobsite
-
Conducted on
-
Prepared by
-
Location
Weekly Jobsite Checklist
-
Review Safety
-
Review Previous Week
Package Job
-
Orders
-
RFI's
-
Drawing Complete
Review
-
Contract
-
Schedule
-
2 Week look ahead
-
Specifications
-
Plans w/ date
-
Scope of Work
-
Submittal Status
RFI's
-
Vent Termination sewer smell
-
Wall thickness RFI
-
Drilling/ Notching
-
Vent on roof
-
All Drains tie into site
-
Tilt-up Sleeves on Panel
-
Shower Valve Height
-
Tub Protection
-
RFI Status/ Log
-
CO Status/ Log
-
Material/ PO Log
-
Packing Slip Log
-
Signage
Finish
-
Count
-
Ordered
-
Delivery Dates
-
Owner Manuals
-
Rentals
-
Manpower/ Crew Mix
Inspections
-
Waste
-
Gas
-
Hydro Water
-
Craft Coordination
-
Duct
-
Fart Fan
-
Electric/ Elevator
-
Framer
-
Drywaller
-
AW Boxes Wr
-
Coring thru electrical
Excess Material
-
Underground
-
Top Out
-
Finish
Insulation
-
Subcontractor
-
We do
Tool Status
-
Need More
-
Send Back
-
List (up to date)
-
Computer
-
Productivity Leadership
-
Pictures
-
Daily's
-
Truck Inspection
-
Job walk & Check-in with Superintendent w/ Foreman
-
Valve tagging
-
Chlorination
-
As-Builts<br>
-
Owners Manual
-
Equipment Make/ Model/ Serial #
-
Any Dollar Plugs out of floor drain
Financial
-
All CO Supplemented
-
Current on payment
-
Pricing up to date
-
Unresolved Issues
-
Completed By: