Title Page
-
Location: 131 - 3216 - WTP 5W NRP
-
Site Safety Walk Location
-
Date/Time:
-
Submitted by:
Site Entry / Boundaries *
-
BMD signs displays complete with contact phone number
-
Safety signs placed
-
Boundary fence maintained
-
Footpath clear of obstructions & trip hazards
-
Vehicle movements controlled
-
Traffic management in place
-
Traffic Controllers provided
-
Traffic barriers erected
Site Office, Crib Room, Other buildings
-
Presence of Industrial logos/insignia/pamphlets
-
Presence of industrial signs that seek to vilify or harass employees
-
Confirmed that all personnel information has been stored correctly
-
Undertake a visual risk assessment of potential hazards in all site buildings
-
Check office spaces for build-up of administration records around desks and on floors generally
-
Check office spaces for build-up of archive boxes or similar that could cause a trip hazard or potential strain with manual handling
-
Check office spaces for exposed cables that could present a trip hazard
-
Check for correct storage of cleaning equipment in washrooms/toilets
-
Check for adequate steps into buildings
-
Check for safe hot water facilities
-
Check toilets are clean and stocked with hand cleanser, towels and toilet paper
Compound *
-
Ammenities are clean
-
No trip hazards in compound
-
Stockpiles clearly defined
-
General waste removed
-
Construction waste removed
-
Drinking water provided
-
Electrical equipment tested & tagged
Excavations & Trenches
-
Permits to excavate all current
-
Services Control Plan displayed in the site office
-
Unattended holes barricaded
-
Benching & shoring of trenches over 1mt
-
Ladders provided and in good order
-
Dewatering required
-
Helmets worn in trench
Lifting Objects
-
Chains tested& tagged (12mths)
-
Crane used with Dogger
-
Workers standing clear of load
Working at Heights Above 2mt * (Bridges, retaining walls, large culvert, etc)
-
Ladders tied off
-
Scaffold checked
-
Edge protection provided
-
Harness supplied and used
-
Elevated work platforms are on stable ground & locked off
-
Workers standing clear of load
Hazardous Chemicals
-
Check that Spill Kits are complete in accordance with the contracts list
-
Visual check that all fuel tanks adequately bundled and stored in appropriate containers
-
Visual check that site is free from contamination from spillage of oil/fuel after maintenance of equipment
Confined Spaces *
-
Risk assessment complete
-
Worker training provided
-
Entry permits used
-
Gas detectors used
-
Tripod & harness proved
-
Other PPE provided
Air Quality and Dust Control *
-
Visual check that water cart in use to Control dust generation
-
Visual check that dust generation is not excessive (Subjective assessment)
-
Visual check that completed areas has been landscaped
Waste Management *
-
Visual check that waste & rubbish being disposed of appropriately
-
Visual check on surrounding area for signs of escaped rubbish and waste
Water Quality / Erosion and Sediment Control *
-
Visual inspection to ensure Control structures installed as per ESCP
-
Visual inspection to ensure Control structures have not less than 70% max capacity
-
Visual check of water courses for obvious changes in water quality (eg, oily films, colour, clarity)
-
Hydro-mulching/landscaping applied in a timely fashion after completion of an area of work
-
Latest Rainfall Event:
undefined
-
Cultural *
-
Visual check for evidence do previously unrecorded aboriginal or early European activities
undefined
-
Check vegetation to be retained is protected
-
Check fauna spotter on-site during clearing
-
Check for weeds and pests
Subcontractors *
-
Check all controls are in place and working safely
-
Work method statements
-
Workers Comp received
-
Public liability received
General *
-
First Aid Kit up to date
-
Inductions for all workers
-
Emergency procedures established & staff trained
-
All workers wearing vests and boots
-
Emergency numbers displayed
-
Adequate PPE available
-
Safety Plan on site
-
Previous Weekly Checks conducted and proposed actions complete ( check last sheet)
-
Incident investigations conducted where necessary
-
Fire Extinguishers within test date (6monthly)
General Comments
-
Actions to confirm
-
Compiled by BMD Rep:
-
Subcontractor Rep:
-
Copy to:
-
Dated: