Title Page

  • Location: 131 - 3216 - WTP 5W NRP

  • Site Safety Walk Location

  • Date/Time:

  • Submitted by:

Site Entry / Boundaries *

  • BMD signs displays complete with contact phone number

  • Safety signs placed

  • Boundary fence maintained

  • Footpath clear of obstructions & trip hazards

  • Vehicle movements controlled

  • Traffic management in place

  • Traffic Controllers provided

  • Traffic barriers erected

Site Office, Crib Room, Other buildings

  • Presence of Industrial logos/insignia/pamphlets

  • Presence of industrial signs that seek to vilify or harass employees

  • Confirmed that all personnel information has been stored correctly

  • Undertake a visual risk assessment of potential hazards in all site buildings

  • Check office spaces for build-up of administration records around desks and on floors generally

  • Check office spaces for build-up of archive boxes or similar that could cause a trip hazard or potential strain with manual handling

  • Check office spaces for exposed cables that could present a trip hazard

  • Check for correct storage of cleaning equipment in washrooms/toilets

  • Check for adequate steps into buildings

  • Check for safe hot water facilities

  • Check toilets are clean and stocked with hand cleanser, towels and toilet paper

Compound *

  • Ammenities are clean

  • No trip hazards in compound

  • Stockpiles clearly defined

  • General waste removed

  • Construction waste removed

  • Drinking water provided

  • Electrical equipment tested & tagged

Excavations & Trenches

  • Permits to excavate all current

  • Services Control Plan displayed in the site office

  • Unattended holes barricaded

  • Benching & shoring of trenches over 1mt

  • Ladders provided and in good order

  • Dewatering required

  • Helmets worn in trench

Lifting Objects

  • Chains tested& tagged (12mths)

  • Crane used with Dogger

  • Workers standing clear of load

Working at Heights Above 2mt * (Bridges, retaining walls, large culvert, etc)

  • Ladders tied off

  • Scaffold checked

  • Edge protection provided

  • Harness supplied and used

  • Elevated work platforms are on stable ground & locked off

  • Workers standing clear of load

Hazardous Chemicals

  • Check that Spill Kits are complete in accordance with the contracts list

  • Visual check that all fuel tanks adequately bundled and stored in appropriate containers

  • Visual check that site is free from contamination from spillage of oil/fuel after maintenance of equipment

Confined Spaces *

  • Risk assessment complete

  • Worker training provided

  • Entry permits used

  • Gas detectors used

  • Tripod & harness proved

  • Other PPE provided

Air Quality and Dust Control *

  • Visual check that water cart in use to Control dust generation

  • Visual check that dust generation is not excessive (Subjective assessment)

  • Visual check that completed areas has been landscaped

Waste Management *

  • Visual check that waste & rubbish being disposed of appropriately

  • Visual check on surrounding area for signs of escaped rubbish and waste

Water Quality / Erosion and Sediment Control *

  • Visual inspection to ensure Control structures installed as per ESCP

  • Visual inspection to ensure Control structures have not less than 70% max capacity

  • Visual check of water courses for obvious changes in water quality (eg, oily films, colour, clarity)

  • Hydro-mulching/landscaping applied in a timely fashion after completion of an area of work

  • Latest Rainfall Event:

undefined

  • Cultural *

  • Visual check for evidence do previously unrecorded aboriginal or early European activities

undefined

  • Check vegetation to be retained is protected

  • Check fauna spotter on-site during clearing

  • Check for weeds and pests

Subcontractors *

  • Check all controls are in place and working safely

  • Work method statements

  • Workers Comp received

  • Public liability received

General *

  • First Aid Kit up to date

  • Inductions for all workers

  • Emergency procedures established & staff trained

  • All workers wearing vests and boots

  • Emergency numbers displayed

  • Adequate PPE available

  • Safety Plan on site

  • Previous Weekly Checks conducted and proposed actions complete ( check last sheet)

  • Incident investigations conducted where necessary

  • Fire Extinguishers within test date (6monthly)

General Comments

  • Actions to confirm

  • Compiled by BMD Rep:

  • Subcontractor Rep:

  • Copy to:

  • Dated:

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.