Information

  • Document No.

  • Audit Title

  • Client / Site

  • Conducted on

  • Prepared by

  • Location
  • Personnel

Administrative

  • First Aid Kits on site and up to Date?

  • Forman or one Person on site Trained in First Aid/CPR?

  • Emergency Procedures/Phone numbers posted in a visible place to all Employees?

  • Department of labor & OSHA signage (OSHA 300A)?

  • Copy of OSHA Standards Posted?

  • Safety and Hazardous Communication program on Site?

  • Tool box talks being conducted by Subcontractors Weekly?

MSDS

  • MSDS on site in designated area in Graham Job Trailer/Office?

  • Subcontractors MSDS on site in designated area in Graham Job Trailer/Office?

  • MSDS up to date for specific site?

  • Flammable Liquids are properly stored?

  • All container clearly marked and properly stored?

  • Hazardous communication discussed at each tool box talk?

  • Lead awareness discussed?

Personal Protective Equipment (PPE)

  • All Employees Wearing Safety Glasses?

  • All Employees Wearing Hard Hat's?

  • Asbestos research/discussed?

  • Gloves Worn when Tasks Require them?

  • Respirators Worn, Employee Fitted and Trained for Proper use?

Fall Protection.

  • All Employees working at Elevations 6' or greater 100% Tied off?

  • All Harness' being properly Worn (leg Straps, Shoulder Straps, Anchorage points)?

  • All Restraints connected to D Ring correctly?

  • Harness'/Lanyards no more than 6 years old from manufacture date?

  • Guardrail installed where applicable, with 4" Toe Board, Mid Rail at 21", Top Rail at 42"?

  • Roof Flagging set up at 15' from leading edge?

Life Safety.

  • Fire Exits fire from Unobstructed and free from Debris?

  • Affected Personnel are Aware of Alternate Exits?

  • Contractors are Participating in Hospital Emergency Fire Drill's?

  • Main fire Alarm Detection and Suppression Systems are Functioning?

  • Temporary Fire Alarms, Detection, Suppression Systems Functioning?

  • Affected Personnel are Aware of Impaired Structural and Compartmental Features of Fire Safety?

Fire Extinguishers.

  • Fire Extinguisher Signage Mounted at the Proper Elevation?

  • Fire Extinguishers Distributed no Greater than 100' of Travel?

  • Fire Extinguishers mounted at Proper Elevation?

  • Fire Extinguishers properly Inspected and Tagged for the correct Municipality?

Tools.

  • Cords on Tools in Tacked Ground Prongs in Tacked?

  • Employees Trained on Laser and Powder Actuated Tools?

  • Safety Shields and Guards used In tacked and Functioning Properly?

Site Access and Egress.

  • Construction Entrances Clearly Marked? (Do Not Enter, Construction Zone, Construction Deliveries)?

  • Emergency Vehicles have a solid access in and Through Job Site?

Scaffolding.

  • Scaffolding is Erected Correctly and Properly Secured?

  • Proper Access to each Level on Scaffold?

  • Toe Boards and Guardrail system in place Correctly, Per OHSA Standards?

  • Stair Tower Secured After Hours at Ground Level?

  • Scaffold Erectors Certified? (Need JSA)?

Ladders.

  • Ladders Used Where Change in Elevation is Greater than 19"?

  • Ladders in good Condition?

  • Extent ion Ladders Secured at top and Bottom?

  • Extension Ladders extend 3' Above Roof Line?

  • No Aluminum Ladders on Site?

Excavation.

  • Iowa One Call has been Contacted Before Digging?

  • Daily Dig Tickets have been filled out?

  • Proper Benching, Sloping, Shoring is taking place in Accordance to Soils Report?

  • Points of Egress from Excavation No More than 25' of Travel. (Ladder Extends 3' Above the Top of the Excavation)?

  • Pot Holing is Taking Place where Utilities are Identified?

  • Spoils are at Least 2' from Edge of excavation?

  • Flagging/Fencing used at Open Trench Locations?

Electrical

  • Temporary Lighting is Adequate?

  • All safety Cages and Lamps in Place?

  • GFCI Log Submitted Each Week?

  • GFCI's Utilized where Necessary?

  • All Energized Romex/SO Protected to an Elevation of 8'?

  • All Electrical Cords in Good Shape (Ground Prongs In Tacked)?

  • All Circuits Clearly Marked on Temp Panels, all Holes Knockouts Plugged? (Duct Tape Not Acceptable)

  • Electrical Cords Not Strung Across Sharp Metal Objects?

Cranes an Rigging

  • Operator is Current on CCO?

  • Crane Inspection up to Date? (Annually, Monthly, Daily)

  • Is Crane Set up on Level Ground per Manufacture Specification?

  • Is Crane Set up Proper Distance from Overhead Power Lines?

  • Has Signaling Method been Approved?

  • Is All Rigging Equipment is good Shape, Free from Tears or Fray?

  • Is Wind (Weather) a Factor?

Equipment.

  • Back up Alarms Functioning Properly?

  • Equipment in Good Shape?

  • Employees are licensed and Properly Trained to Operated Equipment?

  • Fuel Storage Tanks Contained and in Proper Location. Opposite of all Equipment and Site Access?

  • Fuel Storage greater that 25' from Job Trailer?

Housekeeping.

  • Clean up is Continual all Subcontractors Daily?

  • Debris, Dunnage, Pallets, Etc Picked up Around Site?

  • Portable Toilets Adequate Per Manpower, Set up on a cleaning Service?

  • Dumpsters are being Emptied?

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.