Information
-
Project Name
-
Conducted on
-
Prepared by
-
Location
-
Green Canopy Staff on site
-
Subs on site
-
For each item below that is unsafe or unsatisfactory, describe both the unsafe conditions observed and the corrective action taken.
-
Please include photos where applicable to document safety concerns.
Personal Protective Equipment (PPE)
-
Hard Hats
-
Hearing Protection
-
Respiratory Protection
-
Proper Work Attire
-
Proper Footwear
-
Hand Protection
-
Eye / Face Protection
Housekeeping
-
Access & Egress Clear (Stairs, Isles, Walkways)
-
Material Properly Stacked / Stored
-
Debris / Trash Removal
-
Nails - Bent / Removed
Ladders / Stairs
-
Stair Railings / Hand Rails / Pan Fillers
-
Secured / Tied Off
-
Extends 3' Above Landing
-
Proper Use / Corral at Top
Fall Protection
-
Guardrail / Mid-Rail / Toe board / Perimeter cable
-
Floor Hole Covers / Secure / Labelled
-
Personal Fall Arrest / Fall Restraint / Proper design / Swing Fall
Scaffolding / False Work / Shoring / Decking / Concrete
-
Planks / Decks / Platforms Installed Properly
-
Impalement Protection / Rebar Caps / Troughs
-
Proper Access / Ladder / Inspection
-
Proper Bracing / Re-Shore / Pads
-
Inspected / Secured / Structurally Sound
Electrical
-
Adequate Lighting - Task / Area
-
Grounding / Inspection / GFCI Use
-
Cords Elevated / Receptacles / Plugs / Inspected
Fire Protection / Prevention
-
Adequate Extinguishers (Area & Task) / Inspected / Nearby
-
Flammable Materials Storage
Tools - Hand & Power
-
Good Condition / Inspected
-
Guarded / Guards in Place
-
Used Properly
Site / Public Protection
-
Barricading / Fences / Pedestrian Canopy
-
Adequate Signage / Lighting
-
Traffic Control Plan / Flagging
Emergency Preparedness / First Aid
-
Emergency phone numbers posted
-
First Aid Kits / Supplies
-
Adequate Sanitation / Hand washing / Water
Programs / Information / Right to Know
-
Safety Orientation held for Sub
-
All required signage posted
-
"No Trespassing"
Underground / Overhead / Confined Space
-
Confined Spaces - Identified / Training / Permits
-
Excavations / Trenches barricaded - Shoring / Benching / Sloping / Access / PE > 20'
-
Equipment / Material At least 10' from Powelines
-
Additional comments or safety concerns?
-
Photos to document safety concerns
-
Signature