Information

  • Document No.

  • Project name

  • DIS job number

  • Conducted on

  • Client

  • Contractor

  • Staff

  • Personnel

  • Personnel

  • New Personnel (full name + CSCS + NRSWA)

  • Location
  • Prepared by

Instructions

  • Is the job pack on site?

  • RAMS present?

  • Section 50 present?

  • Utility drawings present?

  • GA Drawing present?

  • Blanks for As-Laids?

  • Is the Job Instruction on site?

  • Is Job Instruction clear & understood?

  • Has a Risk Assessment been completed?

Site appearance

  • Is the site safe?

  • Is Chapter 8 correct?

  • Is the work being undertaken according to Job Instruction and GA Specification?

PPE - Is the following being worn/available?

  • Hi-Vis

  • Safety Boots

  • Hard Hat

  • Flame retardant overalls

  • Safety glasses

  • Ear Defenders

  • Gloves

  • Specialist PPE

  • List/Note

Tools & Equipment

  • Do plant & vehicles have working flashing beacons?

  • CAT & GENNY on site?

  • Serial Number

  • Is the plant calibrated and in good working order?

  • Calibration Date

  • First Aid kit on site?

  • Fire Extinguisher

  • Accident Register

  • Spill and Cleanup kit

  • Are tools appropriate for the task?

  • Are the tools in good condition?

Materials

  • Are all materials as per Design/DNO spec?

  • Are all materials stored correctly?

  • Have materials been checked with delivery note?

Other Information

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.