Title Page
-
Conducted on
-
Prepared by
-
Location
-
Project:
-
Client:
-
Contractor:
-
Site Conditions:
Site Security and Fencing
-
Are controls in place to prevent unauthorised access to site? Record with photographic evidence.
-
Is the site fully enclosed and secure?
-
Are supports in place for areas of site fencing where banners or shade cloth has been installed?
-
Are there any concerns regarding site security or fencing arrangements? If so detail and photograph and assign actions? Note: If there is an immediate risk to a persons safety then instruct the works to stop and contact the person in control of site as well as Spiire Construction Team.
Temporary Traffic Management
-
Are the TTM site controls in accordance with the approved TTM plans? Record with photographic evidence.
-
Are the TTM site controls functioning to their designed intent?
-
Are the TTM site controls being modified to suit specific hours of operating as per the approved plans?
-
Is site access as per the approved TTM's, clearly identified and operating?
-
Any concerns regarding TTMP's? If so detail, photograph and assign actions. Note: If there is an immediate risk to a persons safety then instruct the works to stop and contact the person in control as well as Spiire Construction Team.
Site Compound
-
Are site facilities including toilets clean and in an orderly state?
-
Are light vehicles being parked in the designated site parking areas?
-
Does the site compound have demarcation in place for visitors?
-
Are site attendance/site sign in procedures in place for all personnel including visitors?
-
Any concerns regarding the site compound? If so detail, photograph and assign actions. Note: If immediate risk to a persons safety then instruct the works to stop and contact the person in control of site as well as Spiire Construction Team.
Excavations
-
Are excavations being adequately benched/battered in accordance with the Code of Practice for Excavation Work? http://www.legislation.act.gov.au/ni/2015-332/current/pdf/2015-332.pdf
-
Are shoring or restraint mechanisms being used in open trenches and if yes are there procedures in place (SWMS or similar) detailing the controls associated with shoring?
-
Are trenches being protected when left open overnight or for extended periods? If so detail and protection methods and photograph.
-
Any concerns regarding excavations? If so detail and photograph and assign actions. Note: If immediate risk to a persons safety then instruct the works to stop and contact the person in control af site as well as Spiire Construction Team.
Plant and Machinery
-
Are warning devices such as flashing lights and reverse beepers fitted and functioning on plant and equipment inspected? If so detail plant make, model and take photograph.
-
Are plant risk assessments being used for plant and machinery on site? If so photograph a sample with signed authorisation from works.
-
Are heavy plant haul routes clearly delineated onsite? Or is an internal site traffic control procedure in place to delineate haul routes from light vehicle movements?
-
Any concerns regarding plant and machinery? If so detail, photograph and assign actions. Note: If there is an immediate risk to a persons safety then instruct work to stop and contact the person in control of the site as well as Spiire Construction Team.
Site Environmental Controls
-
Are all site controls as documented n the stamped EPA drawings installed onsite?
-
Have silt fences been cleaned out since the last rain event?
-
Has the sediment pond been treated, approval sought from EPA and discharge occurred since the last rain event?
-
Is amendment required to the stamped EPA pollution control drawings due to changes in the work or amendment to site practices? If so detail observations and assign actions to contractors.
-
Is dust being suppressed during earthworks or excavation activities, If no then advise Spiire Construction Team and cease works.
-
Are protective measures in place for no go areas such as existing trees cultural or heritage items?
-
Any observation of impact to downstream waterways from fuel spills, improper sediment controls or improper waste management? If so detail, photograph and assign an action.
-
Are there any areas of erosion that require further control measures? If so detail, photograph and assign actions.
-
Is construction waste being stored and disposed of in accordance with the Contractors EMP?
-
Any concerns regarding Site Environmental Controls? If so detail, photograph and assign actions.