Title Page
-
Site
-
Conducted on
-
Prepared by
-
Location
Formwork
-
Clear access/egress
-
Formwork signs on and exclusion zones up
-
SWMS are up-to-date on site and signed by all workers
-
Fall protections in place
-
Handrails applied as per manufacturer specification?
-
Joist are extended 1.8m on the live edge?
-
Penetrations covered and marked
-
Extention/power leads off the ground and hanging from plastic hooks
-
All workers using PPE
-
Loading areas on the formwork deck with approved back props in place
-
Ladder access to formwork deck secured and compliant
-
All formwork is being done as per the drawings
-
All power tools tested/tagged and tool register up-to-date
-
Required SDS's and recorded on the SDS register
-
Mobile plant logbooks completed
-
Access underneath the deck is marked with green and white tape and signs in place
Stripping
-
Back propping is being done as per the engineer/PB specifications
-
PB approved stripping permit
-
Clear access for stripping area
-
Housekeeping in progress
-
Penetration and slab edges on the level about the stripping area
-
Exclusion zones and stripping in progress signs in place