Information
-
Conducted on
-
Job Name / Job Number
-
Superintendent
Safety Committee Walks
-
Stretch and Flex?<br>Signed Subcontracts?<br>Safety Preconstruction (check at least 3)?<br>WHAT Pre-Task Plans (Review at least 3)?<br>Safety Orientations 100%(Check hard hat decals in the field)?<br>iAudits (all participating)?<br>Daily Dig / Daily Lift check?<br>Qualified Operator List Updated?<br>
GENERAL SAFETY
-
Postings (State, Federal, Emergency #'s, Incident Reporting & Crisis Management)
-
Material Safety Data Sheets (3E MSDS on Demand Posting & Subcontractor MSDS's)
-
First Aid Kit / Eyewash Replenished
-
Sanitation (1 toilet per 20 workers)
-
Housekeeping (trash & debris removed, proper material storage)
-
Date Corrected:
Personal Protective Equipment
-
Proper Attire (shirts 4" sleeves, pants, boots, hard hat)
-
Date Corrected:
-
Eyes (glasses, goggles, face shield)
-
Date Corrected:
-
Other (hearing, gloves, respirators, chemical protection, metatarsal guards)
-
Date Corrected:
Fall Protection System
-
Guardrails (200#, 42" +/- 3", toeboards, wire rope flagged every 6')
-
Date Corrected:
-
Holes (guarded, covered, secured, labeled)
-
Date Corrected:
-
Protection @ 6' (anchor point, harness, lanyard, retractable, rope grab, positioner)
-
Date Corrected:
-
Other (falling object protection, safety nets, warning lines minimum of 15' from edge)
-
Date Corrected:
Fire Protection/Prevention
-
Fire Extinguishers (accessible, identified, charged, w/in 100' of travel, @ stairways)
-
Date Corrected:
-
Fuel Storage (location, container, extinguisher, traffic protection)
-
Date Corrected:
-
Hot Work (fire watch, fire blankets, permit, extinguisher present, debris clear)
-
Date Corrected:
Cranes
-
Daily Lift Plan (Qualified Operator, Signal Person, Rigger, Daily, Periodic and Annual Inspections)
-
Date Corrected:
-
Set-Up (barricaded, level, powerlines 20' minimum clearance)
-
Date Corrected:
-
Outriggers (extended, pads adequate & level per Daily Lift Plan)
-
Date Corrected:
-
Operation (load path, taglines, signal person)
-
Date Corrected:
-
Capacity (charts available, critical lift plan, object weights identified)
-
Date Corrected:
-
Sling Condition (wire rope, synthetic, hardware)
-
Date Corrected:
Access Equipment
-
Extension Ladders (4V:1H, secured at top and base, 3' above landing, 3 points of contact)
-
Date Corrected:
-
Step Ladders (stable, proper use, inspected, non-conductive)
-
Date Corrected:
-
Stairs (metal pan treads filled, uniform w/in 1/4", rails @ 36", unobstucted, illuminated)
-
Date Corrected:
-
Aerial & Scissor Lifts (proper use, fall protection, condition, rails, operator training)
-
Date Corrected:
Electricity
-
Panels (covers in place, circuits identified, weatherproof, secured, breakers/holes filled)
-
Date Corrected:
-
GFCI (@ breakers, outlets, pigtails, electrician weekly testing log)
-
Date Corrected:
-
Electrical Cords (ground, strain relieve, condition, protected from traffic, proper use)
-
Date Corrected:
-
Romex (protected to 8', proper splices taped, fastened every 10' with non-conductive fastener, protected from physical damage)
-
Lighting (adequate- 5 ft candles, protected, secured, sockets filled, separate circuit)
-
Date Corrected:
Excavation
-
Daily Dig Permit (Competent Person Inspection, utilities located, cracks, spalling, water accumulation, changed conditions)
-
Date Corrected:
-
Access/Egress @ 4' (ladder, ramp, stairs within 25' of travel)
-
Date Corrected:
-
Protection @ 5' (slope, bench, shield, shore)
-
Date Corrected:
-
Other (spoils 2' back, vibration, hazardous atmosphere potential)
-
Date Corrected:
Scaffolding
-
Base (sills/plates/jacks/casters, secured, level, locked)
-
Date Corrected:
-
Braces (installed, secured, condition)
-
Date Corrected:
-
Frames (compatible, pinned, condition)
-
Date Corrected:
-
Platform (fully planked, overhang 6"-12" or cleated, plank condition)
-
Date Corrected:
-
Access (integral frame - 16 3/4" rung spacing, ladder w/ gate, stairtower)
-
Date Corrected:
-
Other (secured @ 4V:1H, level, tagged, competent person inspected, tarp/debris net engineer approval)
-
Date Corrected:
Other
-
Concrete (pump 20' from power lines, impalement protection - flat rebar caps)
-
Date Corrected:
-
Motorized Equipment (qualified operator identified, backup alarms, seat belts, equipment condition acceptable)
-
Date Corrected:
General Observations (items not referenced in inspection form and / or add positive comments)
-
-
Date Corrected:
"ALL IN"
-
Is this Project Team "ALL IN"?
Inspector Signature
-
Add signature
Project Superintendent Signature
-
Add signature