Title Page
-
Engineer
- Parmjit Varraich
- Mark Skeldon
- Kyle Smith
- Chris Findler (B.O.S)
- Steven Boardman (B.O.S)
- Balwinder Gill Singh
- Peter Clarke
-
Engineer picture in full PPE
-
Conducted on
-
Prepared by
-
Location
-
Gas Safe Number
-
Engineer EUSR Number
-
Job Type
PIPE WORK ALTERATION
-
Arrival photo (address)
-
Has a survey prior to the job been completed and the customer aware of the works going ahead
-
Has the customer agreed to the re routed position (customer signature)
-
Has the operative re routed the meter
-
Has the pipe work been sleeved in all places where required
-
Are the clips separated 2meters apart (unless required below 2meters)
-
Is the pipe work straight
-
Are all holes sealed with the correct material's
-
Has pipe work been cleaned
-
Have all elbows been cleaned
-
Has gas marker tape been applied to the pipe work
-
Has a tightness test been carried out before T-IN into existing supply? (if so add tightness test results on existing including any permissible drops dependant on meter and existing appliances in mb, "providing there is no smell of gas"!) (evidence) ask engineer for photo proof
-
Are all elbows out of walls and sleeves
-
Have all elbows been leak detected to ensure no leaks
-
Has engineers pipe work been connected to existing supply (evidence)
-
Has the workman ship been completed to a satisfactory level, and customer happy with the works carried out
-
Is the installation safe and ready for you (evidence) ask engineer for photos of tightness test
-
Additional comment's
-
Customer signature (happy with work completed)
-
Auditor signature (print name and sign)
-
Any concerns after completion, I take full responsibility and liability, and will rectify if needed. (engineer signature) (print name and sign)
-
Gas safe registered engineer to review and sign (print name and sign) add gas safe number in note's
-
Whitcombe Engineering LTD (WEL) Director to review and sign (print name and sign)