Title Page
-
Name
- Parmjit Varraich
- Mark Skeldon
- Kyle Smith
- Balwinder Gill Singh
- Peter Clarke
- Steven Boardman (B.O.S)
- Chris Findler (B.O.S)
-
Conducted on
-
Location
-
Gas Safe Number
-
Engineer EUSR Number
-
Job Type
-
Project code
Pipe Work Self Audit
-
Arrival photo (address)
-
Has a survey prior to the job been completed and the customer aware of the works going ahead
-
Has the customer agreed to the re routed position (customer signature) or (picture of survey sheet)
-
Current meter possition
-
Pre tightness test before T-IN into existing supply (add tightness test results on existing including any permissible drops dependant on meter and existing appliances in mb, "providing there is no smell of gas"!) (video evidence)
-
pipe work been sleeved in all places where required (picture evidence)
-
Clips separated 2meters apart (unless required below 2meters) (picture evidence)
-
Is the pipe work straight (picture evidence)
-
Are all holes sealed with the correct material's (picture evidence)
-
Has pipe work been cleaned (picture evidence)
-
Have all elbows been cleaned (picture evidence)
-
Has gas marker tape been applied to the pipe work (picture evidence)
-
Are all elbows out of walls and sleeves (picture evidence)
-
Have all elbows been leak detected to ensure no leaks (picture evidence)
-
All 3 rubber washers changed (picture evidence)
-
Has pipe work been connected to existing supply (picture evidence)
-
Has a second tightness test been carried out
-
Let by test result's (1 minute video) (mb required)
-
Stabilisation test (1 minute video) (mb required)
-
Tightness test (2 minute video) (mb required)
-
Standing pressure results in (mb) (add image)
-
Working pressure results in (mb) (add image)
-
LDF nuts and joints (picture evidence)
-
Is the installation safe and ready for use (picture evidence)
-
I have ensured a safe install and all work carried out to a satisfactory standard. Any concerns after completion, I take full responsibility and rectify if necessary. (signature)
-
Has job been uploaded onto the hub/app
-
Gas Safe Registered engineer to review and sign (add gas safe number in comment's) (print name and sign)
-
Whitcombe Engineering LTD (WEL) Director to review and sign (print name and sign)