Title Page

  • Engineer who completed the job

  • Engineer EUSR number

  • Gas safe number

  • Conducted on

  • Prepared by

  • Location
  • Job completion date

  • Project code

  • CTRL HUB LINK (job submitted by engineer)

Purge & Relight Visual Inspection

  • Arrival photo

  • Is the meter fitted securely

  • Control valve falls to a off position

  • On-Off tape fitted

  • Is the regulator to a satisfactory condition

  • Seal on the regulator

  • Sheer bolts applied

  • EB up to standards, if not EB card left

  • Emergency contact details on the meter and in good condition and east to read

  • Have you applied LDF on all joints, nuts, nipple, unions, elbows, regulator, ECV. (mandatory)

  • Has a leak been detected (pictures)

  • Where is the leak detected (pictures)

  • Have you informed the customer and MADE SAFE! i.e. (disk in the out let, warning notice pad, all correct danger label notices applied, proof, reported to cadent)

  • Engineer responsible

  • Actions taken towards the engineer

  • Date and time incident recorded

  • Next steps (mandatory)

  • Comments

  • Auditor Signature (print name and sign)

  • Whitcombe Engineering LTD (WEL) Director to review and sign (print name and sign)

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.