Title Page
-
Site Name
-
Site Number
-
Location
-
Conducted on
-
What is this WHS area classed as
Site Areas
-
Photos of the main epos comms location
-
Photos of the Existing switches
-
Notes of any existing main epos comms equipment
-
Photos of the any existing access points
-
Locations of the access points
-
Does this site area require a comms cabinet for the new equiptment
-
If there is no room for a new comms cabinet show the best place for a new shelf to be used only for the comms equipment away from any risk of damage. Add plenty of photos of the areas
-
Clearly show the location of the area best suited for the new comms cabinet or epos shelf
-
Show the nearest power supply for the new comms cabinet/area with circuit designation if possible
-
Any other info or photos about this site
-
Show photos of the comms cabinet
-
Does this require a link to another cab or switch position
-
Copper or fibre link
-
Approx meterage of link
-
Multiple photos of the cable route
-
Requirements of the cable installation
-
Link to which site position
-
Does this area require any additional access points
-
show the location of where the access point is to be installed
-
multiple photos of the cabling route
-
requirements of the cabling installation
Site Fire Detection
-
Photos of any fire detection 'asset numbers' that need to deactivated
-
Photos of the fire alarm panels if possible
-
details of how/who can deactivate fire alarm panel inc phone number of 3rd party fire company if possible from outside network rail
Site Permit Systems
-
Note from security all requirements for work permits inc phone numbers or email addresses
Existing site epos system
-
Is there any problems that the manager would like to be noted with any of the systems
Special Requirements
-
Approximate ceiling height for installation
-
Is there any special requirements for the installation of the new epos equipment ie scaffolding mewps floor protection ect
Sign off
-
Surveyor
-
Site duty manager