Title Page
-
Site Name
-
Site Number
-
Conducted on
-
Location
-
Prepared by
Pre Works
-
Add multiple photos of comms cab/switch on shelf before any works commence
Installation
-
Have you successfully patched the new data port directly into the switch or a separate back box?
-
Field end terminations - Please clearly label each data port as 'alarm panel connection' and take multiple photos (close up and at distance)
-
Comms end terminations - please take photos showing clearly labelled port of alarm panel connection
-
Confirm which switch and port number the alarm panel has been patched into
-
Label patch lead both ends as Alarm Panel Connection
-
Please provide photos clearly showing the full cable route from point to point
-
Add multiple photos of the comms cab/switch after completed works
Sign Off
-
Any issues to report
-
Managers Name
-
Managers Signature
-
Engineer Signature