Title Page

  • Site Name

  • Site Number

  • Conducted on

  • Location
  • Prepared by

Pre Works

  • Add multiple photos of comms cab/switch on shelf before any works commence

Installation

  • Have you successfully patched the new data port directly into the switch or a separate back box?

  • Field end terminations - Please clearly label each data port as 'alarm panel connection' and take multiple photos (close up and at distance)

  • Comms end terminations - please take photos showing clearly labelled port of alarm panel connection

  • Confirm which switch and port number the alarm panel has been patched into

  • Label patch lead both ends as Alarm Panel Connection

  • Please provide photos clearly showing the full cable route from point to point

  • Add multiple photos of the comms cab/switch after completed works

Sign Off

  • Any issues to report

  • Managers Name

  • Managers Signature

  • Engineer Signature

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.