Title Page

  • Site conducted

  • Quality Control Check Name

  • Conducted on

  • Account used

  • Scaffold Level

  • Elevation

  • Courtyard North.jpg
  • Courtyard East.jpg
  • Courtyard South.jpg
  • Courtyard West.jpg
  • External North.jpg
  • External East.jpg
  • External South.jpg
  • External West.jpg
  • Section(s)

Substrate

  • Have the Helix fixings been installed (by others) where required ?

  • Please describe the nature of the issue

  • Please confirm the Section in which the issue is located (Refer to elevation plan on title page)

  • Has this now been rectified and reinspected?

  • Please describe what actions were carried out to rectify the issue

  • HOLD POINT - AFTER all of this element's works are fully complete and acceptable for this entire scaffold level / Elevation, take photos showing the element as a whole. Do not continue with works or this form until done.

Galvanised Steel Angle (Courtyard Only)

  • Is this inspection to one of the Courtyard elevations?

  • Is the galvanised steel angle correctly installed - fixings at 450 mm centres as per RRL Drawing 0421-021-58

  • Please describe the nature of the issue

  • Please confirm the Section in which the issue is located (Refer to elevation plan on title page)

  • Has this now been rectified and reinspected?

  • Please describe what actions were carried out to rectify the issue

  • Is the angle installed correctly spanning blocks as per drawing 0421-021-58

  • Please describe the nature of the issue

  • Please confirm the Section in which the issue is located (Refer to elevation plan on title page)

  • Has this now been rectified and reinspected?

  • Please describe what actions were carried out to rectify the issue

  • HOLD POINT - AFTER all of this element's works are fully complete and acceptable for this entire scaffold level / Elevation, take photos showing the element as a whole. Do not continue with works or this form until done.

Aluminium Tapered Brackets

  • Are the tapered brackets fixed with 2 number fixings per bracket? reference TS041-021- 67

  • Please describe the nature of the issue

  • Please confirm the Section in which the issue is located (Refer to elevation plan on title page)

  • Has this now been rectified and reinspected?

  • Please describe what actions were carried out to rectify the issue

  • Are the brackets spaced at max 1200mm centres and 600mm at external corners for 10m. ( note where possible position over existing baton) reference TS041-021- 67

  • Please describe the nature of the issue

  • Please confirm the Section in which the issue is located (Refer to elevation plan on title page)

  • Has this now been rectified and reinspected?

  • Please describe what actions were carried out to rectify the issue

  • Have we applied 2 additional fixings into timber substrate to prevent twist ? reference TS041-021- 67

  • Please describe the nature of the issue

  • Please confirm the Section in which the issue is located (Refer to elevation plan on title page)

  • Has this now been rectified and reinspected?

  • Please describe what actions were carried out to rectify the issue

  • Mechanical fixings correct type as per TS0421-021-67

  • Please describe the nature of the issue

  • Please confirm the Section in which the issue is located (Refer to elevation plan on title page)

  • Has this now been rectified and reinspected?

  • Please describe what actions were carried out to rectify the issue

  • HOLD POINT - AFTER all of this element's works are fully complete and acceptable for this entire scaffold level / Elevation, take photos showing the element as a whole. Do not continue with works or this form until done.

Aluminium Extrusion

  • Is extrusion installed with 10 no fixings each one ? as per TS0421-021-67

  • Please describe the nature of the issue

  • Please confirm the Section in which the issue is located (Refer to elevation plan on title page)

  • Has this now been rectified and reinspected?

  • Please describe what actions were carried out to rectify the issue

  • Are correct fixings being used ? as per TS0421-021-67

  • Please describe the nature of the issue

  • Please confirm the Section in which the issue is located (Refer to elevation plan on title page)

  • Has this now been rectified and reinspected?

  • Please describe what actions were carried out to rectify the issue

  • Are rubber gaskets present ?

  • Please describe the nature of the issue

  • Please confirm the Section in which the issue is located (Refer to elevation plan on title page)

  • Has this now been rectified and reinspected?

  • Please describe what actions were carried out to rectify the issue

  • Are fixings installed at correct centres as per calcs as per TS0421-021-67

  • Please describe the nature of the issue

  • Please confirm the Section in which the issue is located (Refer to elevation plan on title page)

  • Has this now been rectified and reinspected?

  • Please describe what actions were carried out to rectify the issue

  • HOLD POINT - AFTER all of this element's works are fully complete and acceptable for this entire scaffold level / Elevation, take photos showing the element as a whole. Do not continue with works or this form until done.

Capping Flashings

  • Have the capping flashings been installed with correct expansion gap at joints?

  • Please describe the nature of the issue

  • Please confirm the Section in which the issue is located (Refer to elevation plan on title page)

  • Has this now been rectified and reinspected?

  • Please describe what actions were carried out to rectify the issue

  • Has back face fixing been installed at each bracket?

  • Please describe the nature of the issue

  • Please confirm the Section in which the issue is located (Refer to elevation plan on title page)

  • Has this now been rectified and reinspected?

  • Please describe what actions were carried out to rectify the issue

  • Flashings damage / defect free?

  • Please describe the nature of the issue

  • Please confirm the Section in which the issue is located (Refer to elevation plan on title page)

  • Has this now been rectified and reinspected?

  • Please describe what actions were carried out to rectify the issue

  • HOLD POINT - AFTER all of this element's works are fully complete and acceptable for this entire scaffold level / Elevation, take photos showing the element as a whole. Do not continue with works or this form until done.

Completion

  • Are there any other notes relevant to this particular Elevation/Scaffold Level not covered by the previous questions?

  • Are there any other photos relevant to this particular Elevation/Scaffold Level not covered by the previous questions?

  • Sign below to confirm that questions above have been answered truthfully and with all relevant due diligence having been carried out. Please include the person's name.

  • Russell Roofing Signature

  • EQUANS Signature

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.