Title Page

  • Conducted on

  • Location of QA

  • Photos of location

  • Prepared by

QA Inspection

TOP HATS

  • Has the correct top hat been installed

  • Has the top hat been installed to the correct centre's

  • Has the top hat been fixed to the SFS studs

  • has the correct fixings been used

  • Has the top hat been installed to the correct Hight & Level

  • Date & time of inspection

  • Inspected by

  • Inspected by

  • Photo of elevation

Helping Hand Brackets

  • Have the correct helping hand and brackets been used AXL-HB 120S,120D,330S,330D

  • Have the helping hands been set out correct as per design

  • Have all brackets been installed correct as per design

  • Have the correct fixings been used as per design

  • Has the horizontal ADAPTER bracket AXL-HBD80 been installed

  • Has the horizontal brackets been fixed as per design

  • Has the correct slots and dead fix positions been used on the brackets

  • Date & Time of inspection

  • Inspected by

  • Inspected by

  • Photo of elevation

Fire stops HOLD POINT

  • Has the fire strategy location DWG been followed

  • Has the correct FSI paraflam 120 & 75 vertical fire barriers been installed

  • Are the vertical FSI fire barriers installed correct 2 non-combustible fixings centers per 1000mm piece

  • Have the retaining brackets been inserted 75%into the vertical fire barrier and has made intimate contact with substrate

  • Have all vertical fire barriers been tightly abutted

  • Is the vertical fire barriers under the correct compression minimum 5-10mm

  • Has the foil tape been applied to all joints and corners, internally & externally

  • Has foil tape been applied to all abutted joints and not covering the Intermescent strip

  • Has the correct FSI specification OSCB 75/25 or 120/25 horizontal fire barriers been installed

  • Have the horizontal retaining brackets been installed 3 brackets per 1000mm piece fixed at 250mm, 500mm and 750mm centers using non-combustible fixings

  • Have the horizontal fire barriers been installed with intimate contact with substrate

  • Have the horizontal fire barriers been installed tightly between all brackets

  • Has the required open cavity been achieved max gap of 25mm

  • Has the pig tails been installed correct and at the correct centers 250,500,750 per 1000mm

  • Date and time of inspection

  • Inspected by

  • Inspected by

  • Photos of elevation

Insulation

  • Has the correct spec insulation been installed

  • Has the insulation been abutted to each other with no visible gaps

  • Has the insulation been installed with intimate contact with substrate

  • Has the insulation been cut tightly around bracket penetrations

  • Has the correct fixings been used

  • Is the insulation free from damages

  • Date and time of inspection

  • Inspected by

  • Inspected by

  • Photos of elevation

Cavity Trays

  • Has the cavity tray location drawing been followed ?

  • Has the correct length of DPC been installed?

  • Has the DPC been sealed to the inner leaf using Visqueen Zedex Mastic and permanently secured using Visqueen Non-Combustible Fixing Strip and stainless steel fxings suitable for the substrate?

  • Has the DPC overlaps 100mm and sealed with Visqueen Zedex Mastic?

  • Has the back to back stop ends been formed?.

Horizontal & Vertical rails

  • Has the correct Horizontal rail been used 60X40X2.2

  • Has the extension bracket been installed correct ?

  • Has sufficient fixings been installed to the horizontal rails

  • Have the correct dead fix and elongated holes been used

  • Has the correct Brick slip INTERMEDIATE rails been used

  • Has the correct Brick slip End rails been used

  • Has the brick slip rails been fixed correct

  • Are all rails correct as per grid line and datum

  • Are all rails lined and level

  • Are brick slip channels free from bends / damage

  • Has sufficient fixings been installed to the brick slip rails

  • Has the setting out been followed as per design

  • Date & Time of inspection

  • Inspected by

  • Inspected by

  • Photos of elevation

Brick slips

  • Has the correct type of brick been installed

  • Are the bricks sitting in the channels correct

  • Are the bricks lining up with each other

  • Are the bricks flush with each other

  • Has the correct pattern been followed

  • is the bricks slips free from damage

  • Has the correct gap between each slip been maintained 10mm

  • Has the correct mortar been applied and fully imbedded

  • Has the movement joint been maintained

  • Date & Time of inspection

  • Inspected by

  • Inspected by

  • Photos of elevation

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.