Information

  • STORE NAME

  • BRAND

  • STORE / PROJECT NUMBER

  • PROJECT TYPE

  • TYPE OF INSPECTION

  • SITE ADDRESS

  • DATE CONDUCTED

  • PREPARED BY

Executive Summary

Executive Summary

  • Installed / Store Opening Date

  • Installing Contractor

  • Quality of Installation

  • Items requiring follow up

  • Detail of any interviews with store personnel

  • Detail of any recommendation.

  • Detail of any service issues

  • Add media

Asset Register

Asset Register

  • Main AHU

  • Cooling Coils

  • Condenser / Coil

  • Compressor

  • Controller

  • Bakery Exhaust Fan

  • Donut Exhaust Fan

  • Chicken Exhaust Fan

  • Staff Toilet Exhaust

  • Stock room exhaust

  • Smoke Spill and / or Smoke Exhaust

  • MSB Exhaust

  • ACU - 2

  • ACU - 3

  • ACU - 4

  • ACU - 5

  • Other item
  • Add media

Instruction Folder and As Builts

Instruction Folder and As Builts

  • Document Box Provided

  • Operation and Maintenance manual provided

  • Manuals provided in suitably labelled vinyl covered hard backed folder

  • Electrical wiring and control circuits included

  • Commission test detail included

  • Schedule of components included

  • Equipment operating procedures included

  • Stop Start and Fault reset procedures included

  • Plant Maintenance and Service Log Book provided

  • Confirm format suitable for both routine and preventative maintenance activities

  • Laminated 'as built' drawing affixed to plant room wall

  • All ductwork runs and equipment locations shown

  • Other item
  • Add media

Air handler

AHU

  • Adequate lighting provided to all compartments

  • Door Seals / Handles

  • Any noticeable air leaks

  • Magnahelic fitted / Working

  • Coil condition

  • Fire dampers tagged

  • Fire damper access

  • Economy cycle dampers working correctly

  • Internal insulation and lagging

  • Any water in chamber or on floor

  • Drains - Clear and Plumbed correctly

  • Any rust or corrosion

  • Outside & Return air dampers free of dirt / debris

  • All dampers correctly lubricated

  • Fan noise levels

  • Belt guards correctly fitted an secured

  • All access panels fitted & correctly secured

  • Any structural damage - supports, brackets etc

  • Any leaking roof penetrations

  • Other item
  • Add media

Refrigeration Plant

Refrigeration Plant

  • Compressor oil levels

  • Compressor noise levels

  • Compressor pump down efficiency

  • Correct operation of compressor capacity control

  • Coupling guards fitted / correctly secured

  • Refrigerant levels

  • Pressure gauges all operating correctly

  • Any pipe vibration present

  • Suction pipe insulation

  • Any missing service valve caps

  • Pipework installed in accordance with good refrigeration practices / manufacturers recommendations.

  • Pipework correctly secured and bracketed

  • Any rubbish or combustible materials within plant area

  • Other item
  • Add media

Switchboard / Controls

Switchboard / Controls

  • Any missing conduit covers

  • Any loose or dangerous wiring

  • All indicator lights working

  • Correct operation of contactors - overloads set correctly

  • Controller operating correctly

  • Stop / Start and fault reset procedure fixed to face of switchboard

  • Additional item
  • Add media

Heating

Heat Pump

  • Heat pump utilised

  • Coil condition

  • Confirm all fans working

  • Any corrosion

  • Additional item
  • Add media

Elements

  • Electric elements utilised

  • Confirm correct operation of all safety switches etc

  • Confirm correct operation of all elements

  • Confirm safe and easy access to elements

  • Additional item
  • Add media

Reclaim

  • Reclaim utilised

  • Coil condition

  • Confirm correct operation

  • Additional item
  • Add media

Boiler

  • Boiler utilised

  • Confirm correct operation of boiler

  • Confirm correct operation of water pump

  • Make up tank fitted - working correctly

  • Additional item
  • Add media

Condenser

Air Cooled Condenser

  • Air cooled condenser utilised

  • Coils clean and free of debris and dirt

  • Any coil damage

  • Confirm correct fan operation

  • Fan noise levels

  • Additional item
  • Add media

Cooling Tower / Evaporative Condenser

  • Cooling Tower or Evaporative condenser utilised

  • Any water leaks evident

  • Chemical dosing equipment working

  • Chemical stock on site

  • Chemical data sheets provided

  • Structural condition

  • Any corrosion evident

  • Surrounding area clean & tidy

  • Additional Item
  • Add media

Ducting & Ventilation

Air Distribution

  • Ducting Correctly Fastened /Secured

  • Condition of Duct Insulation

  • Any Sweating Ductwork

  • Registers installed correctly

  • Condition of Registers

  • Door Grilles Fitted where required

  • Correct Air Distribution

  • Additional Item
  • Add media

Ventilation

  • Confirm correct operation of stock room exhaust fan/s

  • Confirm Correct Operation of Plant Room Ventilation

  • Confirm Correct Operation of Toilet Exhaust Fan

  • Confirm correct operation of Chicken Hood Exhaust

  • Condition of Chicken Hood Filters

  • Confirm Correct Operation of Chicken Hood Make Up Air

  • Confirm Correct Operation of Bakery Hood Exhaust

  • Condition of Bakery Hood Filters

  • Confirm Correct Operation of Bakery Hood Make Up Air

  • Confirm Correct Operation of Donut Hood Exhaust

  • Condition of Donut Hood filters

  • Additional Item
  • Add media

Ancillary Plant

Ancillary Plant

  • Confirm correct operation of amenities A/C

  • Confirm correct operation of Cash Office A/C

  • Confirm correct operation of Systems Office A/C

  • Confirm correct operation of Managers Office A/C

  • Confirm correct operation of Training Room A/C

  • Additional item
  • Add media

Plant Access

  • Access on to roof

  • Safety ladders provided

  • Walk platforms provided

  • Harness fixing points provided where required

Performance Check

  • Ambient temperature - Deg C

  • Store trading area temperature - Deg C

  • Return air temperature - Deg C

  • Ambient RH - %

  • Store trading area RH - %

  • Evaporator air off temperature (cooling) - Deg C

  • Filter bank pressure drop - pa

  • Compressor 1 suction pressure - KPA (psi)

  • Compressor 1 oil pressure - KPA (psi)

  • Compressor 1 discharge pressure - KPA (psi)

  • Compressor 2 suction pressure - KPA (psi)

  • Compressor 2 oil pressure - KPA (psi)

  • Compressor 2 discharge pressure - KPI (psi)

  • Condenser air on temperature - Deg C

  • Condenser air off temperature - compressor 1 - Deg C

  • Condenser air off temperature - compressor 2 - Deg C

Sign Off

  • Add signature

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.