INSULATED RENDER
-
Has the applicator been given all detail drawings, levels, locations of firebreak expansion beads?<br>
-
Has the applicator got information of what way the adhesive is applied to board.(dabs to grated travel etc)<br>
-
Have all down pipes, vents, grounds, brackets etc. been installed on the wall and properly sealed?<br>
-
Are temporary cappings/capping on?<br>
-
Has the wall been checked for straightness before mesh was applied?<br>
-
Have all door frames and window frames been over lapped by insulation at a minimum of 10 mm in order to ensure of good sealing?
-
Are down pipes on?
-
Has mesh been overlapped properly at joints?
-
Have two number of base coat been applied and sponged?
-
Has all protection been done?<br>
-
Is weather suitable for application of the Acrylic coat?
-
Is wall dry and free from bumps and hollows before application of the Acrylic coat? (must me checked with 2m straight edge).
-
Result of the inspection
-
Site notes
-
Should you have any enquiries regarding this inspection report please contact M Clarke & Sons on 02825822500.
-
M. Clarke Representive