Information

  • Main Contractor

  • Site

  • Location
  • Conducted on

  • Prepared by

  • Drawings used in Area were assessment is being carried out

  • Persons Carrying out work to Area being Accessed

INSULATED RENDER

  • Has the applicator been given all detail drawings, levels, locations of firebreak expansion beads?<br>

  • Has the applicator got information of what way the adhesive is applied to board.(dabs to grated travel etc)<br>

  • Have all down pipes, vents, grounds, brackets etc. been installed on the wall and properly sealed?<br>

  • Are temporary cappings/capping on?<br>

  • Has the wall been checked for straightness before mesh was applied?<br>

  • Have all door frames and window frames been over lapped by insulation at a minimum of 10 mm in order to ensure of good sealing?

  • Are down pipes on?

  • Has mesh been overlapped properly at joints?

  • Have two number of base coat been applied and sponged?

  • Has all protection been done?<br>

  • Is weather suitable for application of the Acrylic coat?

  • Is wall dry and free from bumps and hollows before application of the Acrylic coat? (must me checked with 2m straight edge).

  • Result of the inspection

  • Site notes

  • Should you have any enquiries regarding this inspection report please contact M Clarke & Sons on 02825822500.

  • M. Clarke Representive

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.