Information
-
Document No.
-
Audit Title
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Personnel
GC AND SUPERINTENDENT NAME
SPECIFIC AREA(S) INSPECTED
PERSONAL PROTECTIVE EQUIPMENT
-
Hard hats (with bills forward)
-
Safety glasses with side shields
-
Leather work boots
-
Reflective vests
-
Gloves
-
Hearing protection
-
Face shields
-
Burning goggles
-
Welding hood and gloves
HOUSEKEEPING
-
Material stacked orderly
-
Trash cans in work area
-
Debris properly removed
-
Cords and hoses off the floor
-
Access maintained
TEMPORARY BARRICADES
-
Proper tape used (red for danger, yellow for caution)
-
All sides of work area barricaded
-
Barricade removed or properly disposed of
ELECTRICAL
-
Cords checked for damage
-
Third prong on cords
-
GFCI working
LADDERS AND SCAFFOLDING
-
Ladders tied off
-
Ladder extended 3'
-
Stepladders in open position
-
Inspected and tagged
-
Components undamaged
-
Handrail in place
-
Ladder access
-
Sections properly pinned
-
Planking secured
FALL PROTECTION
-
Guardrail system checked
-
Harness and lanyards checked
-
Horizontal lifeline checked
-
Floor openings covered
-
Roof opening guarded
-
Wall openings guarded
-
Blue fencing up
-
Netting checked
MOBILE EQUIPMENT
-
Seatbelts used
-
Workers trained
-
Equipment inspected
-
Backup alarms working
-
Spotters used when needed
HOISTING AND RIGGING EQUIPMENT
-
Daily crane inspection performed
-
1 eye per hook
-
Sling/chokers stored
-
Qualified rigger named
-
Safety latch on hook checked
-
Cranes flagged off
-
Slings/chokers insoected
-
Lift zone designated
-
Knowledge of crane signals
EXCAVATION
-
Competent person named
-
Shore/slope/bench
-
Excavation checked daily
-
Proper access/egress
-
Spoil pile at least 2' from edge
-
Workers trained
PREWORK
-
Daily Project EHS Inspections are being conducted and inspection sheets are available for review
-
IFE postings and other EHS Postings are in place for the workers on the Project
-
Safe Work Plan was communicated to all workers on the project as a Toolbox Talk (Sign-in sheets are on site and available for review)
-
Weekly EHS Toolbox Talks are relevant to the Project, and sign-in sheets are onsite available for review
-
Daily Pre-Task Safety Plans for each sub-contractor have been reviewed and signed by sub-contractor employees and the GC Superintendent
-
Daily Pre-Task Safety Plans for the GC and all sub-contractors are are onsite available for review
-
MSDS for all chemicals on the project are onsite available for review
-
Preconstruction Safety Meeting was conducted for the Project
-
Safe Work Plan is available for review and completed with all required MOP's, Permits and risk assessments.
-
All required permits obtained, posted and dated properly.
-
UGL LOTO or UOME first lock/tag on and last lock/tag off
-
First Aid Kit is on site, in a sanitary condition and available for all workers on the Project
-
Employee training records are available for work being performed
-
36" minimum emergency egress requirement and uninstructed access to emergency equipment (fire extinguishers, pull stations, eyewash stations) is maintained
COMMENTS
-
Add media
INSPECTION PERFORMED BY:
-
Add signature