QUALITY INSPECTION PROCESS FORM (QIPF)
-
ETR SERVICES, LTD.
-
Form No. QIPF-BTL-1
-
Revision No. 1
-
ASME QC Manual Exhibit No. 1A
GENERAL INFORMATION
-
AUDIT TITLE:
-
CONDUCTED ON:
-
PREPARED BY:
-
LOCATION:
-
JOB #:
-
VESSEL SERIAL NUMBER
-
NATIONAL BOARD # (IF KNOWN):
-
Welding Performed In Accordance With WPS ETR- _______ REV. ____
SECTIONS
SHELL
-
Heat Number(s):
-
Fitter/Welder _ Verify Dimensions - O.D. & Wall Thickness
-
QC _ Verify Dimensions - O.D. & Wall Thickness
-
Date Complete
-
Fitter/Welder _ Orientation Layout Top Plan View
-
QC _ Orientation Layout Top Plan View
-
Date Complete
-
Fitter/Welder _ General Layout (including attachments)
-
QC _ General Layout (including attachments)
-
Date Complete
-
Fitter/Welder _ Internals Layout
-
QC _ Internals Layout
-
Date Complete
HEADS
Head A (bottom if vertical) - Process
-
Head A _ Heat Numbers:
-
Fitter/Welder _ Fit-Up
-
QC Initial _ Fit-Up
-
Date Complete
-
Welder Stencil _ Root Weld (R)
-
Welder Stencil _ Fill Weld (F)
-
Welder Stencil _ Cap Weld (C)
-
QC Initial _ R / F / C
-
Date Complete
Head B (top if vertical) - Process
-
Head B _ Heat Numbers:
-
Fitter/Welder _ Fit-Up
-
QC Initial _ Fit-Up
-
Date Complete
-
Welder Stencil _ Root Weld (R)
-
Welder Stencil _ Fill Weld (F)
-
Welder Stencil _ Cap Weld (C)
-
QC Initial _ R / F / C
-
Date Complete
FLANGED NOZZLES
Heat #s
-
A:
-
B:
-
C:
-
D:
-
E:
-
F:
-
G:
-
H:
-
OTHER: (add any additional nozzles)
Nozzles Inspection
-
Fitter/Welder _Verify Size & Rating for Each Location
-
QC _Verify Size & Rating for Each Location
-
Date Complete
-
Fitter/Welder _Nozzle Fit-Up (Level,Square,2-Hole, Projection)
-
QC _Nozzle Fit-Up (Level,Square,2-Hole, Projection)
-
Date Complete
-
Fitter/Welder _Nozzle Root & Final Weld
-
QC _Nozzle Root & Final Weld
-
Date Complete
-
Fitter/Welder _Repad Fit / Weld & Weep-Hole Location
-
QC _Repad Fit / Weld & Weep-Hole Location
-
Date Complete
COUPLINGS/THREADOLETS
Heat #s
-
A:
-
B:
-
C:
-
D:
-
E:
-
F:
-
G:
-
H:
-
OTHER: (add any additional nozzles)
Coupls/TOLs Inspection
-
Fitter/Welder _Verify Size & Rating for Each Location
-
QC _Verify Size & Rating for Each Location
-
Date Complete
-
Fitter/Welder _Fit-Up (Level, Square, Projection)
-
QC _Fit-Up (Level, Square, Projection)
-
Date Complete
-
Fitter/Welder _Root & Final Weld
-
QC _Root & Final Weld
-
Date Complete
ATTACHMENTS
-
Internals Heat #s (List Size/Type/Heat Code, When Req'd)
-
Fitter/Welder/QC _Supports Fit & Weld
-
Date Complete
-
Fitter/Welder/QC _Name Plate Bracket Fit & Weld
-
Date Complete
-
Fitter/Welder/QC _Internals Fit & Weld
-
Date Complete
-
Fitter/Welder/QC _Attachments Fit & Weld
-
Date Complete
COMMENTS
-
Notes/Comments:
HOLD POINTS
MTR's Reviewed
-
QC
-
DATE:
-
Authorized Inspector
-
DATE:
Dwgs/Worksheets/Calcs Reviewed & Approved
-
QC
-
DATE:
-
Authorized Inspector
-
DATE:
Internals Inspection Complete
-
QC
-
DATE:
-
Authorized Inspector
-
DATE:
Post-Weld Heat Treatment Review & Acceptance
-
QC
-
DATE:
-
Authorized Inspector
-
DATE:
Nondestructive Testing
-
QC
-
DATE:
-
Authorized Inspector
-
DATE:
Pressure Test
-
Pressure Test Gauge #:
-
Test Gauge Range (ex. 0-1000 psi):
-
QC
-
DATE:
-
Authorized Inspector
-
DATE:
Nameplate Attached
-
QC
-
DATE:
-
Authorized Inspector
-
DATE:
U1A Signed
-
QC
-
DATE:
-
Authorized Inspector
-
DATE: