HEADER TRAVELER - CLEANOUT GENERAL
-
DOCUMENT NO. QIPF-HDR-1-B
-
AUDIT TITLE: F/B HEADERS CLEANOUT INSPECTION
-
CONDUCTED ON:
-
PREPARED BY:
-
LOCATION:
-
HEADER SERIAL #
-
NB # (IF KNOWN)
HOLE SIZE & QUALITY VERIFICATION
FRONT HEADER CHECK
-
Hole Size GO/NO GO Gauge
-
Spot-Face (Surface Roughness Gauge)
-
Threads GO/NO GO Gauge
-
Grooves (Surface Roughness Gauge)
-
Interior Cleaniness
-
Flange Size(s) Rating(s)
-
T.O.L. Size(s) Rating(s)
-
Coupling Size(s) Rating(s)
-
Weld Uniformity
-
Welder I.D.
-
Nameplate Bracket
BACK HEADER CHECK
-
Hole Size GO/NO GO Gauge
-
Spot-Face (Surface Roughness Gauge)
-
Threads GO/NO GO Gauge
-
Grooves (Surface Roughness Gauge)
-
Interior Cleaniness
-
Flange Size(s) Rating(s)
-
T.O.L. Size(s) Rating(s)
-
Coupling Size(s) Rating(s)
-
Weld Uniformity
-
Welder I.D.
-
Nameplate Bracket
SIDE-FRAME FIT-UP
-
Correct Headers
-
Measure Side Frame
-
Side Frame Level
-
Side Frame Square
-
Header Level
-
Nozzle and 2 Hole Level
-
Header Brackets
-
Check Tube Pads and Supports
HEADERS & TUBES
-
Turbulators Required/Installed?
-
Headers and Tube Section Complete & Ready for Hydro?
-
COMMENTS:
ACCEPTANCE
-
QC SIGN-OFF
-
DATE: