HEADER DEPARTMENT TRAVELER

  • Document No. QIPF-HDR-1

  • Audit Title: HEADER DEPT CHECKLIST

  • Conducted on

  • Prepared by

  • Location

  • HEADER SERIAL #

  • NB # (IF KNOWN)

WPS

WELDING PROCEDURE ETR WPS & REVISION #

  • ETR-007 REV. 1

  • ETR-007-CJ REV. 0

  • ETR-007-HT REV. 0

  • ETR-007-CJ-HT REV. 0

  • ETR-008 REV. 0

  • ETR-008-CJ REV. 0

  • ETR-021 REV. 1

  • ETR-021-CJ REV. 1

  • OTHER (LIST)

NDT

NON-DESTRUCTIVE TESTING

  • MAG TEST BEVELS (PLATE) BEFORE WELDING (WHEN REQ'D)

  • MAG TEST AFTER WELDING (WHEN REQ'D)

  • MAG TEST REPORT COMPLETE

  • PWHT REQUIRED?

  • PWHT COMPLETE AND ACCURATE PER REQUIREMENTS

HEADERS FIT-UP & WELD-OUT

BOX HEADER FRONT FIT & WELD

  • TUBE/PLUG SHEET HEAT #s

  • WRAPPER HEAT #s

  • END PLATE HEAT #s

  • TS/PS HOLE ORIENTATION

  • HEADER FIT - SQUARE

  • PASS PLATE(S) - LOCATION / FIT-UP

  • PASS PLATE WELDS - QUALITY

  • WRAPPER & END PLATES - FIT-UP

  • WRAPPER & END PLATES WELDS - ROOT & FILL

  • WRAPPER & END PLATES WELDS - CAP

  • HEADER WARPAGE - WITHIN TOLERANCE (.25" MAX)

  • PASS PLATE(S) WELDS SIZE/QUALITY ACCEPTIBLE

  • WELDER STENCILS

HEADER FRONT - FLANGED NOZZLES - FIT & WELD

  • FLANGE HEAT NOs

  • LOCATION

  • HOLE SIZE

  • SIZE, SCHEDULE AND RATING

  • "2-HOLE" STRADDLES NATURAL CENTER LINE

  • ANGLE, HEIGHT, LENGTH

  • ROOT OPENING

  • WELD ROOT PENETRATION, SIZE, QUALITY

  • WELD FINAL INSPECTION

  • RE-CHECK OF NOZZLE ORIENTATION & ANGLE

  • WELDER STENCILS

HEADER FRONT - COUPLINGS AND THREAD-O-LETS - FIT & WELD

  • THREAD-O-LET HEAT #s

  • COUPLING HEAT #s

  • NOZZLE LOCATION / HOLE SIZE

  • COUPLING / O-LET - SIZE, SCHEDULE AND RATING

  • COUPLING / O-LET - ANGLE, HEIGHT

  • COUPLING / O-LET - ROOT OPENING

  • COUPLING / O-LET - WELD ROOT PENETRATION

  • WELD FINAL INSPECTION

  • RE-CHECK OF NOZZLE ORIENTATION AND ANGLE

  • WELDER STENCILS

COMPLETE FRONT HEADER MOVEMENT

  • HEADER CAN BE SENT TO DRILLS DEPARTMENT-SEE HEADER CLEANOUT TRAVELER

BOX HEADER BACK - FIT & WELD

  • TUBE/PLUG SHEET HEAT #s

  • WRAPPER HEAT #s

  • END PLATE HEAT #s

  • TS/PS HOLE ORIENTATION

  • HEADER FIT - SQUARE

  • PASS PLATE(S) - LOCATION / FIT-UP

  • PASS PLATE WELDS - QUALITY

  • WRAPPER & END PLATES - FIT-UP

  • WRAPPER & END PLATES WELDS - ROOT & FILL

  • WRAPPER & END PLATES WELDS - CAP

  • HEADER WARPAGE - WITHIN TOLERANCE (.25" MAX)

  • PASS PLATE(S) WELDS SIZE/QUALITY ACCEPTIBLE

  • WELDER STENCILS

HEADER BACK FLANGED NOZZLES - FIT & WELD

  • FLANGE HEAT NOs

  • LOCATION

  • HOLE SIZE

  • SIZE, SCHEDULE AND RATING

  • "2-HOLE" STRADDLES NATURAL CENTER LINE

  • ANGLE, HEIGHT, LENGTH

  • ROOT OPENING

  • WELD ROOT PENETRATION, SIZE, QUALITY

  • WELD FINAL INSPECTION

  • RE-CHECK OF NOZZLE ORIENTATION & ANGLE

  • WELDER STENCILS

HEADER BACK - COUPLINGS & THREAD-O-LETS - FIT & WELD.

  • THREAD-O-LET HEAT #s

  • COUPLING HEAT #s

  • NOZZLE LOCATION / HOLE SIZE

  • COUPLING / O-LET - SIZE, SCHEDULE AND RATING

  • COUPLING / O-LET - ANGLE, HEIGHT

  • COUPLING / O-LET - ROOT OPENING

  • COUPLING / O-LET - WELD ROOT PENETRATION

  • WELD FINAL INSPECTION

  • RE-CHECK OF NOZZLE ORIENTATION AND ANGLE

  • WELDER STENCILS

COMPLETE BACK HEADER MOVEMENT

  • HEADER CAN BE SENT TO DRILLS DEPARTMENT-SEE HEADER CLEANOUT TRAVELER

QC & AI HOLD POINTS SIGN-OFF

REVIEW AND REQUIREMENTS

  • ASME CODE HEADERS?

  • MATERIAL TEST REPORTS REVIEWED BY QUALITY CONTROL

  • MATERIAL TEST REPORTS REVIEWED BY AUTHORIZED INSPECTOR

  • WORKSHEETS AND CALCULATIONS REVIEWED BY QUALITY CONTROL

  • WORKSHEETS AND CALCULATIONS REVIEWED BY AUTHORIZED INSPECTOR

  • INTERNALS INSPECTION COMPLETE BY QC

  • INTERNALS INSPECTION COMPLETE BY AI

  • NDT REVIEW BY AI

  • NDT REVIEW BY QC

  • PWHT REVIEW BY AI

  • PWHT REVIEW BY QC

  • HYDROSTATIC TEST PASSED BY QC

  • HYDROSTATIC TEST PASSED BY AI

  • ASME, U AND NB STAMPS APPLIED TO NAMEPLATES

  • U1A SIGNED BY QCM

  • U1A SIGNED BY AI

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.