Information
-
Document No.
-
TLMP
-
SHEQ Safety Site Assessment EDF Energy Contract
-
Conducted on
-
Prepared by
-
Location
-
Auditors name
0.1-Policies & Procedures
-
0.1-Is the new H&S law poster displayed?
-
0.2-Are all relevant policies procedures displayed and up to date?
2.0 - Fire Prevention
-
2.1 - Evacuation plan displayed and understood by all employees?
-
2.2 - Evacuation procedures carried out regularly? (2 times a year)
-
2.3 - Extinguishers in place, clearly marked for type of fire?
-
2.4 - Extinguishers in inspection date .
-
2.5 - Extinguishers clear of obstructions?
-
2.6 Is there a fire register on site and inspections cared out
-
2.7 - Fire extinguishers Indicator signs ?
-
2.8 - Adequate direction notices for fire exits?
-
2.9 - Exit doors easily opened from inside?
-
2.10 - Exits clear of obstructions?
-
2.11 - Fire alarm system functioning correctly and regular tests
3.0 - General Lighting
-
3.1 - Good natural lighting?
-
3.2 - Reflected light from walls & ceilings not causing glare to employees?
-
3.3 - Light fittings clean and in good condition?
-
3.4 - Emergency exit lighting operable and tested?
-
3.5 Any environmental implementations in place
4.0 - Building Safety
-
4.1 - Floor surfaces even and uncluttered?
-
4.2 - Entry and walkways kept clear?
-
4.3 - Walkways adequately and clearly marked?
-
4.4 - Intersections kept clear of boxes etc?
-
4.5 - Stair and risers kept clear?
-
4.6 Spill kits in appropriate areas for use in the event of spill?
-
4.7 - Are railings in good condition?
-
4.9 - Are footpaths in good condition?
-
4.10 - Furniture in sound condition?
-
4.11 - Loading area clean and tidy?
-
4.12- Is their adequate welfare facilities on site?
5.0 - Workshop Area
-
5.1 - Clear of rubbish?
-
5.2 - Tools not in use kept in place?
-
5.3 - No damaged hand tools in use?
-
5.4 - No damaged power tools in use?
-
5.5 - Work height correct for the type of work and the employee?
-
5.7 All power tools PATested and fit for use?
-
5.7 All access equipment tagged and inspected?
-
5.8 specialist Waste segregation in place?
-
5.9 - Staff aware of safety message of the day?
6.0 - Rubbish Removal
-
6.1 - Bins located at suitable points around site and segregation in operation?
-
6.2 - Bins emptied regularly?
-
6.3 - Oily rags and combustible refuse in segregated containers?
7.0 - Storage Design and Use
-
7.1 - Materials stored in racks/storage bins wherever possible?
-
7.2 - Storage designed to minimise lifting problems?
-
7.3 - Floors around racking clear of rubbish?
-
7.4 - All chemicals stored in Yellow COSHH cabinet?
8.0 - Machines
-
8.1 - Are they kept clean?
-
8.2 - Are the floors around the machines kept clean?
-
8.3 - Guards in good condition?
-
8.4 - Starting and stopping devices within easy reach of operator?
-
8.6 - Drip pans on floor to prevent spillage?
-
8.7 - Adequate work space?
-
8.8 - Is lighting adequate?
-
8.9 - Noise levels controlled?
-
8.10 - No bending or stooping required?
-
8.12 - Operators trained/inducted into the operation of the machines?
-
8.13 - Is the training recorded?
-
8.14 - Do operators comply with the training?
-
8.15 - Are lockout procedures implemented and followed?
9.0 - Electrical Safety
-
9.1 - Safety switches installed?
-
9.4 - Portable equipment tested and tagged?
-
9.5 - No broken plugs, sockets or switches?
-
9.6 - No power leads across walkways?
-
9.7 - No frayed or damaged leads?
-
9.8 - No strained leads?
-
9.9 - Portable power tools in good condition?
10.0 - COSHH
-
10.1 - Hazardous Substance Register complete and available?
-
10.2 - Material Safety Data Sheets available for all chemicals SIPOL folder available?
-
10.3 - Risk assessments completed for hazardous substances?
-
10.4 - All containers labelled correctly?
-
10.5 - Unused substances disposed of?
-
10.6 - Do special storage conditions apply?
-
10.7 - If applicable are special storage conditions followed?
-
10.8 - Workers trained in the use of hazardous substances?
-
10.9 - If required is PPE available?
-
10.10 - Is adequate ventilation provided?
-
10.11 - Are eye washes and showers easily accessed?
-
10.12 - LEV being maintained?
11.0 Access Equipment
-
11.1 - Are all ladders Industrial strength? (Non Household rated, check label.)
-
11.2 - Are ladders in good condition?
-
11.3 - If used for electrical work are they non conductive? (Wood or fibre glass.)
-
11.4 - Used according to instructions?
-
11.5- Is there access/ladder register in place?
12.0 - First Aid Facilities
-
12.1 - Are cabinets and contents clean and orderly?
-
12.2 - Are contents regularly checked?
-
12.3 - No contents past their expiry date?
-
12.4 - Cabinets clearly labelled and visible?
-
12.5 - Is there easy access to cabinets?
-
12.6 - Employees aware of location of first aid cabinet?
-
12.7 - Are first aid officers accessible?
-
12.8 - Are emergency numbers/contacts displayed?
13.0 - Office
-
13.1 - Condition of filing cabinets?
-
13.2 - Condition of chairs? (Five star bases.)
-
13.3 - Desks in good condition? (No damage.)
-
13.4 - Screen Based Equipment positioned to reduce glare from windows etc?
-
13.5 - Photocopiers positioned to avoid fumes?
-
13.6 - Tasks designed to prevent Occupational Overuse Syndrome? (Breaks included.)
-
13.7 - Air conditioning systems regularly maintained?
-
13.8 - Stable non-slip floor coverings in good condition?
-
13.9 - DSE assessment carried out and Register?<br> Any high risk rating?
-
13.10 - H & S board up and displaying up to date and relevant information?
Sign Off
-
On site representative
-
Auditor's signature
-
Notes for improvement !