Audit / Inspection Details

  • Title of Compliance Audit

  • Audited/Inspected by:

  • Department / Client (PCBU)

  • Contact Name and Details (PCBU)

  • Contacts
  • Department Manager

  • Team Leader

  • Worksite Supervisor

  • Health and Safety Representative (HSR)

  • Date and time of compliance inspection

  • Location

1. Worksite Access (Road and signs)

    1. Worksite Access (Road access and signage)
  • 1.1 Is there sufficient signage in place advertising work in progress?<br>

  • 1.2 Are traffic controller ahead signs in place (Stop / Slow)?

  • 1.3 Are flashing hazard lights being used and working?

  • 1.4 Are sufficient traffic cones or bollards in use?

  • 1.5 Are all access and side tracks secured from unauthorised public entry?

  • Other safety issues

  • Safety issue
  • 1.6 Safety Issues

  • 2. Worksite Entry and Traffic Control (Vehicle and Pedestrian)
  • 2.1 Is signage in place for "No Unauthorised Entry"?<br>

  • 2.2 Are all persons must report to site office or site controller displayed?

  • 2.3 Is PPE required for site displayed?

  • 2.4 Worksite speed limit displayed?

  • 2.5 Site contact names and numbers displayed?

  • 2.6 Is the site secure from unauthorised entry of vehicles and/or traffic?

  • 2.7 Are spotters provided to control and direct pedestrian and vehicle traffic (where required)?

  • 2.8 Is a formal traffic management plan (TMP) available for the worksite (If required)?

  • Other safety issues

  • Safety issue
  • 2.9 Safety Issues

3. Site Office / Crib Hut

3. Site Office / Crib Hut

  • 3.1 Are there designated parking areas for plant, workers and visitors?

  • 3.2 Is there a WHS notice board displayed?

  • 3.3 WHS policy displayed, signed by senior management and current?

  • 3.4 Is a site induction conducted?

  • 3.5 Are responsible persons names and titles displayed?<br>Site Manager<br>Superintendent<br>WHS Officer<br>Worker Safety Representative<br>Work Health and Safety Representative (HSR)<br><br><br>

  • 3.6 entry and exits clearly marked?

  • Other safety issues

  • Safety issue
  • 3.7 Safety Issues

4. Visitor Controls

4. Visitor Controls

  • 4.1 Are visitors required to formally sign-in and out?

  • 4.2 Is the visitor to be escorted at all times while on site? (If yes, a basic induction is only required).

  • 4.3 Is a means of identifying visitors implemented?

  • 4.4 Are visitors advised of emergency procedures?

  • 4.5 Are areas where visitors are not permitted clearly identified / explained?<br><br><br>

  • 4.6 Is suitable PPE provided to visitors?

  • Other safety issues

  • Safety issue
  • 4.7 Safety Issues

5. Sub Contractors

5. Sub Contractors

  • 5.1 Are contractors made aware of company WHS policies and rules before commencing work<br>

  • 5.2 Do engaged contractors provide adequate insurances (Workers Compensation and Public Liability to 20 Million)?

  • 5.3 Are sub-contractors safety systems and consultation arrangements harmonised with the engaging PCBU?

  • 5.4 Are sub-contractors management systems provided to the principle PCBU?

  • 5.5 Are checks made of the contractors plant and equipment for compliance and safety?

  • Other safety issues

  • Safety issue
  • 5.6 Safety Issues

6. Emergency Procedures

6. Emergency Procedures

  • 6.1 Are emergency procedures displayed?

  • 6.2 Emergency services 000 and PCBU names and numbers?

  • 6.3 Site map available?

  • 6.4 Are training drills conducted periodically, verbally at toolbox talk and practically exercised (6 monthly)?

  • 6.5 Is there an effective alarm system in place?

  • 6.6 Muster / Assembly point identified?

  • 6.7 Fire equipment available and tagged for currency?

  • Other safety issues

  • Safety issue
  • 6.8 Safety Issues

7. Communication

7. Communication

  • 7.1 Is communication available (Phone, radio, satellite)?

  • 7.2 Does the worksite have agreed radio contact numbers for various locations?

  • 7.3 Do all workers on-site know the radio numbers for locations?

  • 7.4 Do workers understand basic hand signals (i.e. Stop)?

  • Other safety issues

  • Safety issue
  • 7.5 Safety Issues

8. First Aid

8. First Aid - First Aid Code of Practice

  • 8.1 Qualified first aid names displayed (First aid level).

  • 8.2 Medical supplies checked for currency and expiry date?

  • 8.3 First aid kits for workers on-site within easy access?

  • 8.4 Medical supplies and facilities are adequate for the nature, location and composition of workers on site?

  • Other safety issues

  • Safety issue
  • 8.5 Safety Issues

9. Workplace Amenities

9. Workplace Amenities

  • 9.1 Toilets available on site?

  • 9.2 Are toilets provided for each gender?

  • 9.3 Washing facilities provided?

  • 9.4 Are toilets and shower areas cleaned regularly?

  • 9.5 Are sufficient consumables made available in washrooms and toilets?

  • 9.6 Are sufficient tables and chairs provided?

  • 9.7 Are lunchroom, kitchen facilities clean and hygienic?

  • 9.8 Is clean drinking water provided?

  • Other safety issues

  • Safety issue
  • 9.9 Safety Issues

10. Consultation (Pre-start briefs, toolbox talks)

10. Consultation (Pre-start briefs, toolbox talks)

  • 10.1 Is there a WHS project or site specific plan in place?

  • 10.2 Do all workers have their General Construction Card on-site?

  • 10.3 Are pre-start shift meetings conducted?

  • 10.4 Are toolbox talks conducted periodically to discuss safety issues between worker and management?

  • 10.5 Are there worker safety representatives I.e. HSR

  • 10.6 Do workers understand the PCBUs legal responsibilities for consultation?

  • Other safety issues

  • Safety issue
  • 10.7 Safety Issues

11. Personal Protective Equipment (PPE)

11. Personal Protective Equipment (PPE)

  • 11.1 PPE allocated to workers specific to activities (Australian Standard)?

  • 11.2 Workers wearing PPE required by company policy?<br>

  • 11.3 High visibility clothing?

  • 11.4 Hard hat and wide brim hat?

  • 11.5 Fully enclosed footwear?

  • 11.6 Are signs displayed where specified PPE must be worn?

  • 11.7 Is PPE fitted correctly, serviceable and in good condition?

  • 11.8 Do workers wear PPE when mandated in SWMS?

  • Other safety issues

  • Safety issue
  • 11.9 Safety Issues

12. Manual Handling

12. Manual Handling (Hazardous Manual Tasks Code of Practice)

  • 12.1 Is a risk assessment conducted for manual tasks (heavy lifting or strenuous work)?

  • 12.2 Are workers trained in lifting practices?

  • 12.3 Do workers request assistance for heavy or awkward lifting tasks?

  • 12.4 Do workers warm before heavy lifting to avoid strain injuries?

  • 12.5 Are adequate rest breaks allocated to allow workers time to recover?

  • Other safety issues

  • Safety issue
  • 12.6 Safety Issues

13. Safety Issue, Hazard Reporting and Controls

13. Safety Issue, Hazard Reporting and Controls (Hierarchy of control)

  • 13.1 Are safety issue / hazard and near miss reporting forms available on-site

  • 13.2 Do workers understand the procedure for reporting safety concerns (Stop work, apply control or report to supervisor)?

  • 13.3 Are risk assessments conducted to identify site hazards with controls implemented?

  • 13.4 Do workers know and refer to the hierarchy of control?

  • Other safety issues

  • Safety issue
  • 13.5 Safety Issues

14. Incident Reporting and Investigation

14. Incident Reporting and Investigation

  • 14.1 Are incident / injury forms available on site?

  • 14.2 Do workers report all incidents ASAP?

  • 14.3 Are all incidents fully investigated and effective remedial action implemented?

  • 14.4 Are WorkCover NSW "Notifiable Incidents and Preservation Site", regulations clearly understood by the PCBU?

  • Other safety issues

  • Safety issue
  • 14.5 Safety Issues

15. Safe Work Method Statements (SWMS)

15. Safe Work Method Statements (SWMS) - Code of Practice for Construction Work

  • 15.1 Have workers been inducted and consulted, in the development of SWMS?

  • 15.2 Are SWMS systematic with steps, hazards and controls?

  • 15.3 Are SWMS specific to the activity and easy for workers to understand?

  • 15.4 Do all workers understand SWMS and are they signed off?

  • 15.5 Are SWMS monitored and reviewed for effectiveness?

  • 15.6 Are SWMS provided to the principle contractor?

  • 15.7 Do SWMS meet the minimum standards required by applicable Codes of Practice?

  • Other safety issues

  • Safety issue
  • 15.8 Safety Issues

16. Plant (General)

16. Plant (General) - (Evidence required i.e. documentation)

  • 16.1 Has plant been assessed as safe to use and complaint to Australian standards?

  • 16.2 Are operators trained and Verified as Competent (VOC); is evidence available?

  • 16.3 Are daily pre-start checklist completed and faults reported?

  • 16.4 Are repairs and maintenance conducted in a timely manner (Risk rated)?

  • Other safety issues

  • Safety issue
  • 16.5 Safety Issues

17. Safe Operating Procedures (SOP) & (VOC)

17. Safe Operating Procedures (SOP & VOC)

  • 17.1 Are worker safe operating procedures (SOP) in place specific to plant?

  • 17.2 Are operators provided with periodic checks on SOPs?

  • 17.3 Are operators verified as competent (can evidence be provided)?

  • Other safety issues

  • Safety issue
  • 17.4 Safety Issues

18. Plant used to Lift Loads

18. Plant used to Lift Loads

  • 18.1 Loads requiring calculation must be slung by a competent person i.e a licensed dogman?

  • 18.2 Are all ropes, slings, chains and lifting attachments inspected daily before use?

  • 18.3 Are loads properly calculated before lifting commences?

  • 18.4 Does the Crane operator and Dogman communicate effectively?

  • Other safety issues

  • Safety issue
  • 18.5 Safety Issues

19. Isolation: Tag-out, Lockout

19. Tag-out, Lockout Procedure (SWMS)

  • 19.1 Do operators understand the initial tag-out procedure?

  • 19.2 Are tags available in the machine or location?

  • 19.3 Do mechanics apply their own locks when working on machinery?

  • 19.4 Are all locks issued to a person keyed identically?

  • 19.5 Are operators notified of return to service?

  • 19.6 Are there procedures or SWMS for Isolation, tag-out and lock-out.

  • Other safety issues

  • Safety issue
  • 19.7 Safety Issues

20. Environmental Controls

20. Environmental Controls

  • 20.1 Is there an environmental plan in place?

  • 20.2 Are work practices designed to reduce impacts to the environment?

  • 20.3 Are sediment barriers used around perimeters of earthworks and waterways?

  • 20.4 Is dust suppression available (E.g. Water carts)?

  • 20.5 Are vehicles and plant purchased and maintained to reduce emission levels?

  • 20.6 Are procedures available for the disposal of waste and used hazardous substances E.g. Safety Data Sheets?

  • 20.7 Does the company have a recycling policy?

  • Other safety issues

  • Safety issue
  • 20.8 Safety Issues

21. Plant Exclusion Zones

21. Plant Exclusion Zones

  • 21.1 Permit completed?

  • 21.2 Signs in place to identify exclusion zone?

  • 21.3 Exclusion zones secured?

  • Other safety issues

  • Safety issue
  • 21.4 Safety Issues

22. Storm Water Run-off

22. Storm Water Run-off

  • 22.1 Weather monitored to implement controls to minimise soil erosion?

  • 22.2 Silt control fences in place or other?

  • 22.3 Waterway traps inserted to contain and remove contaminants?

  • Other safety issues

  • Safety issue
  • 22.4 Safety Issues

23. Occupational Noise

23. Occupational Noise

  • 23.1 Have all areas been assessed for the presence of harmful noise levels?

  • 23.2 Are all workers in the presence of harmful noise levels wearing hearing protection?

  • 23.3 Are noise hazard locations identified by safety signs or stickers?

  • 23.4 Are workers wearing hearing protection provided with hearing tests (Every 2 years if wearing hearing protection)?

  • Other safety issues

  • Safety issue
  • 23.5 Safety Issues

24. Site Rehabilitation

24. Site Rehabilitation

  • 24.1 Are work plans available to include procedures for re-instatement of work sites?

  • 24.2 Are all locations rehabilitated to meet EPA standard?

  • 24.3 Bin location prominent, adequate and emptied regularly?

  • 24.4 All materials removed from sites?

  • 24.5 No litter strewn around site ?

  • 24.6 Laydown (repairs and maintenance) areas defined with fluids properly disposed of?

  • Other safety issues

  • Safety issue
  • 24.7 Safety Issues

25. Hazardous Substances (Chemicals)

25. Hazardous Substances (Chemicals) - Code of Practice for Hazardous Substances

  • 25.1 Are hazardous materials identified and control measures implemented?

  • 25.2 Are Safety Data Sheets available for all substances used in the workplace?

  • 25.3 Are all safety data sheets current (not over 5 years old)?

  • 25.4 Have risk assessments been conducted to eliminate or minimise the type of chemicals used?

  • 25.5 Are workers trained in the safe handling and application of hazardous chemicals?

  • 25.6 Do workers follow SDS procedures when handling chemicals?

  • 25.7 Are chemicals stored properly ( E.g. 110% bunded and in-compatible separation)?

  • 25.8 Are all containers used for handling chemicals labeled correctly?

  • 25.9 Is the product identified correctly?<br>- Australian address, business telephone number and manufacturer / import identified?<br>- hazardous chemical pictograms consistent with correct classification?<br>

  • 25.10 Are first aid treatment and emergency procedures available relevant to the chemical?

  • 25.11 Do workers using hazardous chemicals require health monitoring (Refer chemical)?

  • 25.12 Are workers wearing PPE as prescribed by the safety data sheet (SDS) for chemical used?

  • Other safety issues

  • Safety issue
  • 25.13 Safety Issues

26. Electrical and Power Tools

26. Electrical and Power Tools

  • 26.1 Is electrical equipment tagged and tested for currency?

  • 26.2 Is the site shed protected by Residual Current Device (RCD) Electrical circuit breaker?

  • 26.3 Are power boards used (no double adaptors or piggy backs)?

  • 26.4 Do portable power tools have RCDs?

  • 26.5 Are leads inspected daily for damage (Hostile environment)?

  • Other safety issues

  • Safety issue
  • 26.6 Safety Issues

27. Portable Power Tools

27. Portable Power Tools?

  • 27.1 Are power tools in good condition?

  • 27.2 Are adequate storage facilities provided?

  • 27.3 Are all guards in place?

  • 27.4 Is hearing protection worn if over 85dB?

  • Other safety issues

  • Safety issue
  • 27.5 Safety Issues

28. Hotwork

28. Hotwork

  • 28.1 Permit to conduct hot work (Usually encompasses a risk assessment)?

  • 28.2 Have risk assessments been conducted where hot work presents a risk?

  • 28.3 Is fire fighting equipment available for fire prone locations?

  • 28.4 Are flammables or explosive substances removed from location prior to hot work?

  • 28.5 Spotter available if required within permit?

  • 28.6 is correct PPE being worn for task?

  • 28.7 Welding screens and fire blankets in place?

  • Other safety issues

  • Safety issue
  • 28.8 Safety Issues

29. Gas Cylinders

29. Gas Cylinders (Oxy and Acetylene etc)

  • 29.1 Are gas cylinder properly stored (chained and secured)?

  • 29.2 Gas cylinders properly turned off and hoses wound up?

  • 29.3 PPE available and used for welding or oxy cutting?

  • 29.4 Cylinders secured, gauges operative, flashback arresters fitted and hoses in good condition?

  • 29.5 LPG - Is the LPG cylinder stamped as current (Within 5 years) and in serviceable condition?

  • Other safety issues

  • Safety issue
  • 29.6 Safety Issues

30. Working at Heights

30. Working at Height (Generic)

  • 30.1 Risk assessment conducted?

  • 30.2 Are workers trained in working at heights?<br> - Evidence provide e.g. tickets?

  • 30.3 Height of work and regulations checked?

  • 30.4 Is there electricity power cables in close proximity to the work?<br>- Have effective controls been implemented?<br>- Essential energy notified 13 20 80 to conduct preliminary risk assessment if required?

  • 30.5 Correct edge protection in place and to a structural strength?<br>AS/NZS 1576 Scaffold Series?

  • 30.6 Fall protection device includes AS/NZS 1891.1<br>- a secure fence<br>- edge protection<br>- working platforms and;<br>- covers

  • 30.7 Surfaces are structurally capable of supporting all persons and things that may be located or placed on it?

  • 30.8 Surface materials not brittle?<br>- skylights identified?<br>

  • 30.9 Pitch of roof assessed?<br>- less than 15 degrees?<br>- worker no closer than 3 metre from edge?<br>- how is this controlled?

  • 30.10 If no edge protection and the roof is flat and is less than 15 degrees the following applies:<br>1. Conduct a risk assessment?<br>2. Floor sound and not slippery?<br>3. No person is to be within 3 metres of the edge?<br>4. Optional - 3 metre line is identified with a barrier or adequate controls that ensures a person cannot cross?

  • 30.11 Loose objects secured from falling?

  • Other safety issues

  • Safety issue
  • 30.12 Safety Issues

31. Portable Ladders

31. Portable Ladders

  • 31.1 AS/NZS 1892 Portable Ladder?

  • 31.2 Load rating of 120kg?

  • 31.3 Ladder placed at 1:4 or no more than 1:6 slope?

  • 31.4 Is the ladder secure at top and bottom?

  • 31.5 Does ladder extend 900mm to 1 metre above the landing platform?

  • 31.6 Fall protection at stepping of point?

  • 31.7 Are temporary ladders not > 6 metres between successive ladder landings?

  • Other safety issues

  • Safety issue
  • 31.8 Safety Issues

Compliance Officer, Managment, Supervisor Comments

    Compliance Officer

Compliance Officer, Managers, Supervisor Comments

  • Overall summary and rating

  • Comments

  • Name and signature of person conducting compliance audit

  • Team Leader

Team Leader

  • Comments

  • Name and signature

  • Line Manager

Line Manager

  • Comments

  • Name and signature

  • Site Supervisor

Site Supervisor

  • Comments

  • Name and signature of person in charge of worksite

Worker Names, Titles and Signature

Workers On-site, Names, Titles and Signature

  • Worker name, title and signature

  • Worker name
  • Name of worker and signature (Add title if required)

Sketch/Draw Details

  • Sketch/Draw Details (If required)

  • Sketch detail
  • Section and sub-section details

  • Date and time

  • Sketch details

  • Location
  • Photo

  • Name and signature

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.