Information

  • Daily Work Site Safety Inspection

  • Document No.

  • Riverfront Park Phase 1

  • Conducted on

  • Prepared by

  • Location
  • Specific Area(s) Inspected

Pre-Work

  • Pre-task safety plan communicated, understood and signed by each worker?

  • Fire extinguishers maintained

  • All required permits obtained

  • Stretch-N-Flex complete

  • Ports-Johns have been cleaned

Personal Protective Equipment

  • Hardhats (bills forward)

  • Face shields

  • Gloves

  • Safety glasses with side shields

  • Burning goggles

  • Hearing Protection

  • Leather work boots

  • Welding hood and gloves

  • Reflective Vests

Fall Protection (100% Fall Protection Required at Six Feet or Greater)

  • Guardrail systems checked

  • Floor and Roof openings covered

  • Fall protection used when over 6' feet

  • Hole covers secure and labeled

Ladders and Scaffolding

  • Ladder tied off

  • Workers facing ladder

  • Scaffold inspected and tagged

  • Ladder extended three feet

  • Handrail in place

  • Stepladders in open position

  • Components not damaged

  • Compliant ladders being used

  • Planking secured

Housekeeping

  • Material stacked orderly

  • Impalement Protection in place

  • Cords and hoses off floor

  • Trash cans in work area

  • Access maintained

  • Debris removed

  • Nails removed and clinched

Hoisting and Rigging Equipment

  • Daily crane inspection

  • Knowledge of crane signals

  • Crane Warning Lights working properly

  • Sling/chokers stored

  • Cranes flagged off

  • Lift zone designated

Mobile Equipment

  • Seat belts used

  • Backup alarms working

  • Spotters used when needed

Excavations

  • Utilities located

  • Proper access/egress

  • Shore/shield/slope/bench proper

  • Air monitoring if over 4' feet deep

  • Spoil pile 2' feet from edge

  • RPE design if over 20' feet deep

  • Excavation checked daily

Temporary Barricades

  • Proper tape used(red-danger, yellow-caution)

  • All sides of work area barricaded

  • Barricade removed and disposed of properly

Electrical

  • Cords checked for damage

  • GFCI provided and working

Environmental

  • No hazardous material spills

Comments

  • Comments

  • Sign Here

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.