Title Page
-
Site conducted
-
Conducted on
-
Prepared by
-
Location
Checklist
Before Cladding Installation
-
Sufficient clearance is available in-between window frame and stud wall to install cladding as per guide line?
-
Windows are correctly positioned and plumb?
-
Wall wrapping is completed?
-
Window head flashings are installed as per cladding installation guide line?
-
Window side flashings are installed as per cladding installation guide line?
After Cladding Installation
-
External corner flashing installed as per cladding installation guide line?
-
Internal corner flashing installed as per cladding installation guide line?
-
External corner joint sealant done (If applicable)?
-
Internal corner joint sealant done (If applicable)?
-
Window surround sealant done as per cladding installation guide line?
-
Cladding bottom flashing installed as per cladding installation guide line?
-
Window surround architraves installed as required?
-
Interface of different type of claddings are sealed properly?
-
Nails are punched properly to avoid issues with painting works?
-
Correct type of vertical joint material is used for the cladding?
-
Correct type of horizontal joint material is used for the cladding?
-
Same expressed joint width is used throughout (If Applicable)?
-
Gaps around any penetrations through cladding are sealed (over flow , conduits , services pipes etc )?
-
Any damages in the claddings panels?
-
Any damages to windows by cladding installers?
-
Any damages to flashings , roofs etc by cladding installers?
-
Work area and site is cleaned properly?
Comments / Actions
-
Comments
-
Media
Sign Off
-
Supervisor Signature
-
Date and Time