Title Page

  • Site conducted

  • Conducted on

  • Prepared by

  • Location

Checklist

  • Install batten as specified in drawings and supplier regulation

  • Cladding Board Thickness as per specification/Drawings

  • Batten installed as per WD/ Product details

  • Materials Installation as per supplier guideline

  • Thickness of cladding

  • Nail/Screw type and spacing

  • Control Joint as per Manufacture requirements

  • Bottom clearance between flashing and cladding (Minimum 10 mm)

  • PVC/Metal Starter channel installed as per manufacturer details

  • Render colour as per C&M

  • No of render coat as specified in C&M

  • Render finish consistent through the surfaces

  • Vertical horizontal edges are staights

  • Is the site clean of rubbish and debris

  • Are there any internal or external damages to the property

Comments

  • Comments

  • Media

Sign Off

  • Supervisor Signature

  • Date and Time

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.