Title Page
-
Site conducted
-
Conducted on
-
Prepared by
-
Location
Checklist
-
Install batten as specified in drawings and supplier regulation
-
Cladding Board Thickness as per specification/Drawings
-
Batten installed as per WD/ Product details
-
Materials Installation as per supplier guideline
-
Thickness of cladding
-
Nail/Screw type and spacing
-
Control Joint as per Manufacture requirements
-
Bottom clearance between flashing and cladding (Minimum 10 mm)
-
PVC/Metal Starter channel installed as per manufacturer details
-
Render colour as per C&M
-
No of render coat as specified in C&M
-
Render finish consistent through the surfaces
-
Vertical horizontal edges are staights
-
Is the site clean of rubbish and debris
-
Are there any internal or external damages to the property
Comments
-
Comments
-
Media
Sign Off
-
Supervisor Signature
-
Date and Time