Title Page

  • Site conducted

  • Conducted on

  • Prepared by

  • Location

Checklist

  • Plumber has completed all plumbing works against the approved Wet Area Plan (please confirm plumbing Check list has been completed)

  • All electrical work has been completed and complete electrical roughen checklist against approved RCP plan

  • All heating cooling plumbing work has been completed

  • Ducting for WC exhaust fans have been properly installed

  • Frame approval has been obtained

  • All opening sizes for internal opening are as per approved fixing plan

  • The wall frames for their compliance installation and Window checklist completed

  • All shower bases are checked for correct installation in accordance with their manufacture's guidelines

  • All baths are checked for proper support

  • Ducting for WC exhaust fans have been properly installed

Wall and Ceiling / Roof Insulation

  • Wall insulation as per stamped energy report

  • Acoustic installation installed as per C&M (special requirement)

  • Insulation installed behind the bracing walls

  • Roof insulation as per stamped energy report

Comments

  • Comments

  • Media

Sign Off

  • Supervisor Signature

  • Date and Time

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.