Title Page
-
Site conducted
-
Conducted on
-
Prepared by
-
Location
Checklist
-
Plumber has completed all plumbing works against the approved Wet Area Plan (please confirm plumbing Check list has been completed)
-
All electrical work has been completed and complete electrical roughen checklist against approved RCP plan
-
All heating cooling plumbing work has been completed
-
Ducting for WC exhaust fans have been properly installed
-
Frame approval has been obtained
-
All opening sizes for internal opening are as per approved fixing plan
-
The wall frames for their compliance installation and Window checklist completed
-
All shower bases are checked for correct installation in accordance with their manufacture's guidelines
-
All baths are checked for proper support
-
Ducting for WC exhaust fans have been properly installed
Wall and Ceiling / Roof Insulation
-
Wall insulation as per stamped energy report
-
Acoustic installation installed as per C&M (special requirement)
-
Insulation installed behind the bracing walls
-
Roof insulation as per stamped energy report
Comments
-
Comments
-
Media
Sign Off
-
Supervisor Signature
-
Date and Time