Title Page
-
Store Number
-
Store Name
-
Location
-
Conducted on
-
Engineer Name
Site Pre-installation Works
-
Declaration - I have read and accepted the Risk assessment and method statement for works to be completed
-
On arrival to site, signed in and completed first part of contractor portal(enroute/onsite etc) please tick to confirm portal completed
-
Is lifter on site(if required) keys present and battery sufficiently charged (attach images of place left)
-
Please upload a screenshot of IP Tracker BEFORE install (from helpdesk)
-
Pre works ACD check (BO forms, empty send etc) Is ACD working as intended
-
Any other problems/issues/devices offline
Abort Description
-
Please provide a description of reason for abort
-
Please include supporting pictures(store closed/lifter issues/provisioning fail screenshots etc)
Post Works Checks
-
Please upload a screenshot of IP Tracker before leaving site
-
ACD Connected - Showing 4-BO Forms, empty send etc (If any patching touched at all)
-
Any remaining issues that require investigation or elements that could not be completed?
-
Lifter has been placed back where delivered and keys left in location found (attach images)
Sign Off
-
Confirmation that contractor portal has been completed
-
Engineer comments/issues (aborts etc)
-
Engineer in attendance
-
LIDL representative
-
Time Leaving site