Title Page
Site Details
-
Date of FAC Inspection:
-
Zoom Fibre and Zombie Representative on site
-
Please Provide the actual location of the Manhole
Manhole Inspection
-
Manhole Number
-
Is the Manhole clearly visible and the surroundings free of debris?
-
Is the Manhole Labeled correctly
-
Is the Manhole Coping clean and free of debris?
-
Rate the integrity of the manhole
-
Is the Manhole Clean and free of debris internally? (Housekeeping)
-
Is the Manhole Lock fucntional?
-
Rate the Manhole fishtail integrity
-
Rate the foam sealing of the Manhole entries and exits
-
Slack brackets mounted securely on the Manhole Chassis?
-
Mounting joint bracket securely installed on the Manhole Chassis?
Joint Inspection
-
Is there a fibre joint?
-
Joint Type
-
Is the joint secured on the joint bracket?
-
Joint integrity
-
Joint Labelling correct?
-
Are all cables are secured (strength member) to the joint
-
Does the joint have the correct seals installed?
-
Fibre tray labelling correct?
-
Rate the fibre routing
-
Is the joint slack management in trays neatly coiled in a single direction and measured correctly to the splice holder?
-
Are the correct splice protectors used?
-
Rate the splicing quality
Duct Inspection
-
Are the 7-ways labeled correctly?
-
End caps are present on all unused micro-ducts
Fibre Cable Inspection
-
Inspected fibre cables for any damages or kinks
-
Is there 30m of slack?
-
Is the fibre cable labeling correct?
-
Is the cable coiled neatly on the slack brackets?
Sign-Off's
-
Zombie Sign-Off
-
Zoom Fibre Sign-Off