Title Page
-
Site
-
Conducted on
-
Prepared by
-
Location
-
Sub-Contractor
First Fix Joinery
-
Building sufficiently watertight to commence (relative to humidity %)
-
Timber to specification with treatment certificated
-
Timber type i.e right thickness / PSE / sawn graded and ungraded
-
Agree all datums and setting out points
-
Fixing method and types to specification and centres
-
Plumb, level, line, twist of grounds, boxing and frames
-
Check bracings
-
Check openings
-
Check tolerances
-
Note: All following trades rely on the correct grounds
Sign Off
-
Site Manager
-
Date
-
Sub-contractor
-
Date