TSA 12 Monthly PPM
EXITS & EMERGENCIES:
-
Has a 90 minute Discharge Test Been Conducted
-
Have results been recorded in CleverSparky
-
Was there any failed fittings
-
Were fittings replaced
-
Provide EEL fitting number and new fitting ID number
-
Has Drawing & Labelling Been Updated as Required?
Switchboards And RCDS
-
Have switchboard schedules been edited, drawn or marked up
-
Have All RCD's Been Tested & Recorded With a Metrel?
-
Have ALL Faults/Repairs Been Completed?
-
Details of repairs
-
Details of why repair could not happen
-
Have Switchboards Been Visually Checked And Notes Made of
-
Any Potental Issues?
-
Detail of issues
-
Have FOCUSED Thermograph Photos of DB (Normal Photo & Thermographic Photo) Been Taken?
-
Have FOCUSED Photos Of The Switchboard (Outside Overall, Outside Open, Switchboard Schedules & Internals) Been Taken?
240 Volt Smoke Detectors Only
-
Smoke detector type
-
Have Smoke Detectors Been Tested (Test Button and Smoke)?
-
Are Smoke Detector Units In Date?
-
Were Any Units Replaced?
-
Details of replacement
-
Are Lithium Batteries Installed?
GENERAL ELECTRICAL INSPECTION:
-
Are Any Rectification Works Required?
-
Detailed response of works required
Test and Tag
-
Has Test & Tag Register Been Updated?
Final Check List
-
Have Reports Been Put in Red Essential Services Box On Site?
-
Smoke Detector Stickers applied to all Smokies
-
Installed By SureNet Sticker/s (Where applicable)
-
Compliance Stickers,(Switchboard Inspection & Testing Schedule),
-
Are Site Works Completed As Per Scope
-
Photo evidence of dated compliance sticker