Title Page

  • Site conducted

  • Conducted on

  • Prepared by

  • Apartment number

  • Associated drawing number

Untitled Page

  • Ductwork installed to correct drawing number

  • Ductwork routes are followed as per ductwork layout

  • Any drawing deviations have been recorded and sent back to CAD department

  • Ductwork has been installed to a good standard

  • Ductwork has no open ends

  • Ductwork has been installed to correct invert levels

  • Intake and exhaust ductwork insulated as per spec

  • Punkha Louver positions are in correct location w 50mm tolerance

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.