Information

  • PLANT RISK ASSESSMENT

  • Audit Title / Plant Name

  • Plant Number

  • Conducted on

Part A - ASSESSMENT SUMMARY

  • Date Risk Assessment Date Completed

  • Plant Description/Name (Assessment Title):

  • Plant No.

  • Please take photo of plant

  • Which of the following is this assessment?

  • Location (where plant is stored)

  • RISK ASSESSMENT TEAM

  • Name

  • Position

  • Signature

  • Date

  • RISK ASSESSMENT TEAM

  • Name

  • Position

  • Signature

  • Date

  • RISK ASSESSMENT TEAM

  • Name

  • Position

  • Signature

  • Date

  • Department Manager:

  • Select date

  • WHS Representative (HSR)

  • Select date

Part B - HAZARD IDENTIFICATION

  • Can this piece of plant or process be eliminated entirely?

  • List identified hazards from the Plant Hazard Checklist and detail measures taken or that need to be taken to address the hazards

  • Code Reference from Plant Hazard Checklist (e.g. B3 or H7)

  • Identified Hazard (expanded explanation)

  • Existing Controls in Place

  • Likelihood

  • Consequence

  • Risk Rating (please select the one applicable which match up Likelihood and Consequnce)

  • Proposed Additional Controls (List those relevant to this hazard)

  • Likelihood

  • Consequence

  • Residual Risk (once controls are in place or implemented)

  • Person Responsible

  • Enter date for control to be completed by

  • List identified hazards from the Plant Hazard Checklist and detail measures taken or that need to be taken to address the hazards

  • Code Reference from Plant Hazard Checklist (e.g. B3 or H7)

  • Identified Hazard (expanded explanation)

  • Existing Controls in Place

  • Likelihood

  • Consequence

  • Risk Rating (please select the one applicable which match up Likelihood and Consequnce)

  • Proposed Additional Controls (List those relevant to this hazard)

  • Likelihood

  • Consequence

  • Residual Risk (once controls are in place or implemented)

  • Person Responsible

  • Enter date for control to be completed by

  • List identified hazards from the Plant Hazard Checklist and detail measures taken or that need to be taken to address the hazards

  • Code Reference from Plant Hazard Checklist (e.g. B3 or H7)

  • Identified Hazard (expanded explanation)

  • Existing Controls in Place

  • Likelihood

  • Consequence

  • Risk Rating (please select the one applicable which match up Likelihood and Consequnce)

  • Proposed Additional Controls (List those relevant to this hazard)

  • Likelihood

  • Consequence

  • Residual Risk (once controls are in place or implemented)

  • Person Responsible

  • Enter date for control to be completed by

  • List identified hazards from the Plant Hazard Checklist and detail measures taken or that need to be taken to address the hazards

  • Code Reference from Plant Hazard Checklist (e.g. B3 or H7)

  • Identified Hazard (expanded explanation)

  • Existing Controls in Place

  • Likelihood

  • Consequence

  • Risk Rating (please select the one applicable which match up Likelihood and Consequnce)

  • Proposed Additional Controls (List those relevant to this hazard)

  • Likelihood

  • Consequence

  • Residual Risk (once controls are in place or implemented)

  • Person Responsible

  • Enter date for control to be completed by

  • List identified hazards from the Plant Hazard Checklist and detail measures taken or that need to be taken to address the hazards

  • Code Reference from Plant Hazard Checklist (e.g. B3 or H7)

  • Identified Hazard (expanded explanation)

  • Existing Controls in Place

  • Likelihood

  • Consequence

  • Risk Rating (please select the one applicable which match up Likelihood and Consequnce)

  • Proposed Additional Controls (List those relevant to this hazard)

  • Likelihood

  • Consequence

  • Residual Risk (once controls are in place or implemented)

  • Person Responsible

  • Enter date for control to be completed by

  • List identified hazards from the Plant Hazard Checklist and detail measures taken or that need to be taken to address the hazards

  • Code Reference from Plant Hazard Checklist (e.g. B3 or H7)

  • Identified Hazard (expanded explanation)

  • Existing Controls in Place

  • Likelihood

  • Consequence

  • Risk Rating (please select the one applicable which match up Likelihood and Consequnce)

  • Proposed Additional Controls (List those relevant to this hazard)

  • Likelihood

  • Consequence

  • Residual Risk (once controls are in place or implemented)

  • Person Responsible

  • Enter due date for control to be implemented by

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.