Information
-
PLANT RISK ASSESSMENT
-
Audit Title / Plant Name
-
Plant Number
-
Conducted on
Part A - ASSESSMENT SUMMARY
-
Date Risk Assessment Date Completed
-
Plant Description/Name (Assessment Title):
-
Plant No.
-
Please take photo of plant
-
Which of the following is this assessment?
-
Location (where plant is stored)
-
RISK ASSESSMENT TEAM
-
Name
-
Position
-
Signature
-
Date
-
RISK ASSESSMENT TEAM
-
Name
-
Position
-
Signature
-
Date
-
RISK ASSESSMENT TEAM
-
Name
-
Position
-
Signature
-
Date
-
Department Manager:
-
Select date
-
WHS Representative (HSR)
-
Select date
Part B - HAZARD IDENTIFICATION
-
Can this piece of plant or process be eliminated entirely?
-
List identified hazards from the Plant Hazard Checklist and detail measures taken or that need to be taken to address the hazards
-
Code Reference from Plant Hazard Checklist (e.g. B3 or H7)
-
Identified Hazard (expanded explanation)
-
Existing Controls in Place
-
Likelihood
-
Consequence
-
Risk Rating (please select the one applicable which match up Likelihood and Consequnce)
-
Proposed Additional Controls (List those relevant to this hazard)
-
Likelihood
-
Consequence
-
Residual Risk (once controls are in place or implemented)
-
Person Responsible
-
Enter date for control to be completed by
-
List identified hazards from the Plant Hazard Checklist and detail measures taken or that need to be taken to address the hazards
-
Code Reference from Plant Hazard Checklist (e.g. B3 or H7)
-
Identified Hazard (expanded explanation)
-
Existing Controls in Place
-
Likelihood
-
Consequence
-
Risk Rating (please select the one applicable which match up Likelihood and Consequnce)
-
Proposed Additional Controls (List those relevant to this hazard)
-
Likelihood
-
Consequence
-
Residual Risk (once controls are in place or implemented)
-
Person Responsible
-
Enter date for control to be completed by
-
List identified hazards from the Plant Hazard Checklist and detail measures taken or that need to be taken to address the hazards
-
Code Reference from Plant Hazard Checklist (e.g. B3 or H7)
-
Identified Hazard (expanded explanation)
-
Existing Controls in Place
-
Likelihood
-
Consequence
-
Risk Rating (please select the one applicable which match up Likelihood and Consequnce)
-
Proposed Additional Controls (List those relevant to this hazard)
-
Likelihood
-
Consequence
-
Residual Risk (once controls are in place or implemented)
-
Person Responsible
-
Enter date for control to be completed by
-
List identified hazards from the Plant Hazard Checklist and detail measures taken or that need to be taken to address the hazards
-
Code Reference from Plant Hazard Checklist (e.g. B3 or H7)
-
Identified Hazard (expanded explanation)
-
Existing Controls in Place
-
Likelihood
-
Consequence
-
Risk Rating (please select the one applicable which match up Likelihood and Consequnce)
-
Proposed Additional Controls (List those relevant to this hazard)
-
Likelihood
-
Consequence
-
Residual Risk (once controls are in place or implemented)
-
Person Responsible
-
Enter date for control to be completed by
-
List identified hazards from the Plant Hazard Checklist and detail measures taken or that need to be taken to address the hazards
-
Code Reference from Plant Hazard Checklist (e.g. B3 or H7)
-
Identified Hazard (expanded explanation)
-
Existing Controls in Place
-
Likelihood
-
Consequence
-
Risk Rating (please select the one applicable which match up Likelihood and Consequnce)
-
Proposed Additional Controls (List those relevant to this hazard)
-
Likelihood
-
Consequence
-
Residual Risk (once controls are in place or implemented)
-
Person Responsible
-
Enter date for control to be completed by
-
List identified hazards from the Plant Hazard Checklist and detail measures taken or that need to be taken to address the hazards
-
Code Reference from Plant Hazard Checklist (e.g. B3 or H7)
-
Identified Hazard (expanded explanation)
-
Existing Controls in Place
-
Likelihood
-
Consequence
-
Risk Rating (please select the one applicable which match up Likelihood and Consequnce)
-
Proposed Additional Controls (List those relevant to this hazard)
-
Likelihood
-
Consequence
-
Residual Risk (once controls are in place or implemented)
-
Person Responsible
-
Enter due date for control to be implemented by