Information

  • FFP

  • Conducted on

  • Prepared by

  • Contractor

  • Section of work audited - eg 7 Smith Street to 59 Smith Street

  • Are all starter pipes been installed to ensure that provisioning can take place for?

  • Enter comments here

  • 55.102 Have all Pole to Boundary installations been done as required to facilitate provsioning?

  • Enter comments here

  • 16.027 Do all buried drop offs have a locate peg installed?

  • Enter comments here

  • Have all manholes/pits lids been correctly installed including working locks and rubber?

  • 17.02 Pit lids

  • 17.04 Manhole

  • Enter comments here

  • 17.021 In all pits have entry holes been cut to the right diameter so that it is tight against the ribbonet?

  • Enter comments here

  • 17.011 If the pit entry hole is not cut to correct diameter has it been sealed with epoxy?

  • Enter comments here

  • 16.026 Are all microducts correctly labelled?

  • Enter comments here

  • Is the drop off at the customers boundary endcapped, heatshrunk and buried or in an approved enclousre - eg pedestal

  • 15.026 For Fixed Fibre

  • 16.008 Microduct

  • Have all Flash 9's been installed in the correct orientation, and correct type? Eg Ribbonet/Aerial/Hybrid

  • Enter comments here

  • Have all end runs been sealed correctly and photos taken to allow the completion of the NDF13042 form?

  • 13.016 Aerail +Fibre Cable

  • 16007,16.008 Duct Microducts

  • Enter comments here

  • 16.007/16.008 Duct microducts

  • Enter comments here

  • 77.013 Have all tubes in the Flash 9 been correctly sealed with duct end stops?

  • Enter comments here

  • 16.010 Have all cut tubes in all joints been sealed with duct end stops?

  • Enter comments here

  • 17.004, 17.005, 72.006 - Is the site free from ALL trip hazards?

  • Enter comments here

  • 13.028, 39.017, 39.018 Is all aerial fibre correctly secured with the appropriate number of clamps?

  • Enter comments here

  • Enter comments here

  • 25.012 Is any aerial fibre rubbing against a tree or concrete pole? if so, has this been covered correctly so as to not cause damage to the cable?

  • Enter comments here

  • 12.012, 17.026, 77.012 Have all right size gas seals been installed in the main joint and throughout the build? (Either 1 WMN or 12mm)

  • Enter comments here

  • 17.001 In the Handhole or Chamber, are starter pipes/ducts the correct length (50mm) and reamed?

  • Enter comments here

  • 25.012 Is the distribution cable rubbing against any pole that may cause damage to the fibre optic cable?

  • Enter comments here

  • 2.009 Is all bearer connectivity confirmed "end to end" i.e visible light source?

  • Enter comments here

  • 73.004 Are there any damaged Pillar terminals and site tidy, no task waste?

  • Enter comments here

  • 1.007 Is the pit there sufficient room left for the closure to be worked on from both sides when the closure is stood up or ?

  • Enter comments here

  • 11.01, 11.011, 11.022 Is fibre management to standard? i.e (connectors cleaned & verified with Fibre Inspection probe, all optical cables 100% support on horizontal & managed on vertical (no more than 400mm fibre cable unsupported), OFDF hardware secure.

  • Enter comments here

  • 19.002, 77.002 Is all labelling to standard? i.e all closures, feeder cables.

  • Enter comments here

  • 17.027 Is all reinstatement to standard?

  • Enter comments here

  • 1.001,19.002, 2.009 Is all documentation provided a accurate reflection of the physical network? ie FOG plans, Lay Plans, Haul Plans, WATCH document sign off?

  • Enter comment below of ANY misalignments

  • 77.041 Is there ANY signs of water ingress or missing grommets?

  • Enter comments below of ANY water ingress issue

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.