Information
-
Exch/FFPxx and ABFFP ID
-
Add location
-
Conducted on
-
Pieter Van Wyk
-
Add signature
-
Instructions for pressure testing:
Install end stop on boundary end of Microduct
Using valve tap and guage setup at ABFFP, connect to microduct to be tested as below -
Pressurise the microduct
- If testing at 1.0bar pressure, pressurise for 120 seconds
- If testing at 4.0bar - pressurise for 90 seconds
Close the valve tap
Allow pressure in microduct to stabilse - a 500m length may take a few seconds to stabliese, a 1000m length may take about 20-30 seconds to stabilise -
Take photo of gauge once stabilised. Ideally show the ABFFP label in background
-
Monitor the pressure for 60 seconds
-
Take photo of the gauge after 60 seconds. Ideally show the ABFFP label in background
-
Release the pressure by slowly opening the valve tap.
Install end stop at ABFFP -
Take internal photo of compliant ABFFP
-
Change out O-Ring seal and install lid
-
Take external photo of compliant ABFFP
-
Did all tested tubes pass?
-
If no, record details
-
Update NDF245 1.3 (supplied in document pack). Please ensure you record any working customers that you did not test.