Information

  • Exch/FFPxx and ABFFP ID

  • Add location
  • Conducted on

  • Pieter Van Wyk

  • Add signature

  • Instructions for pressure testing:
    Install end stop on boundary end of Microduct
    Using valve tap and guage setup at ABFFP, connect to microduct to be tested as below

  • Pressure testing photo1.png
  • Pressurise the microduct
    - If testing at 1.0bar pressure, pressurise for 120 seconds
    - If testing at 4.0bar - pressurise for 90 seconds
    Close the valve tap
    Allow pressure in microduct to stabilse - a 500m length may take a few seconds to stabliese, a 1000m length may take about 20-30 seconds to stabilise

  • Take photo of gauge once stabilised. Ideally show the ABFFP label in background

  • Monitor the pressure for 60 seconds

  • Take photo of the gauge after 60 seconds. Ideally show the ABFFP label in background

  • Release the pressure by slowly opening the valve tap.
    Install end stop at ABFFP

  • Take internal photo of compliant ABFFP

  • Change out O-Ring seal and install lid

  • Take external photo of compliant ABFFP

  • Did all tested tubes pass?

  • If no, record details

  • Update NDF245 1.3 (supplied in document pack). Please ensure you record any working customers that you did not test.

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.