Information

  • Client / Site

  • Conducted on

  • Prepared by

  • Contractor

1WMN

  • 16.010 Is all 1WMN jointed correctly?

  • 16.026 Is all 1WMN labelled correctly?

  • 1.001 Is all 1WMN installed to the location on the plans (or a marked up asbuilt available for the Fibre Jointer)?

Flash 9s

  • 1.001 Are all Flash9's in the location shown on the plans (or a marked up asbuilt available for the Fibre Jointer)?

  • Are all Flash 9's the correct orientation and the correct type for the Fibre Jointing to commence?

  • 77..012, 77.013 Have all gas seals been installed correctly?

  • 77.013, 77.034, 77.056 Have all Flash9's been correctly sealed to the required standards?

Aerial

  • 15.005 Are loops on the correct poles?

  • 13.028 Have the correct number of cushion clamps been installed?

  • Are all loops at the correct length and mounted on the correct side of the poles?

  • 13.001? When an OFDC is to be installed above the A-FFP, has a 48AEF coil been left?

Fixed Fibre

  • Has all Fixed Fibre been hauled to the correct locations (or an updated asbuilt available)

  • Has all fixed fibre been labelled

Control Joint

  • Has adequate length of cable been left in the manhole (circa 30m)

  • Has the cable been correctly labelled?

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.