1WMN
-
16.010 Is all 1WMN jointed correctly?
-
16.026 Is all 1WMN labelled correctly?
-
1.001 Is all 1WMN installed to the location on the plans (or a marked up asbuilt available for the Fibre Jointer)?
Flash 9s
-
1.001 Are all Flash9's in the location shown on the plans (or a marked up asbuilt available for the Fibre Jointer)?
-
Are all Flash 9's the correct orientation and the correct type for the Fibre Jointing to commence?
-
77..012, 77.013 Have all gas seals been installed correctly?
-
77.013, 77.034, 77.056 Have all Flash9's been correctly sealed to the required standards?
Aerial
-
15.005 Are loops on the correct poles?
-
13.028 Have the correct number of cushion clamps been installed?
-
Are all loops at the correct length and mounted on the correct side of the poles?
-
13.001? When an OFDC is to be installed above the A-FFP, has a 48AEF coil been left?
Fixed Fibre
-
Has all Fixed Fibre been hauled to the correct locations (or an updated asbuilt available)
-
Has all fixed fibre been labelled
Control Joint
-
Has adequate length of cable been left in the manhole (circa 30m)
-
Has the cable been correctly labelled?