  • Site conducted

  • Document No. GYP 007 v1.0

  • Client / Site

  • Audit Title

  • Block/Plot No

  • Conducted on

  • Prepared by

  • Site Address
  • All other trades are complete and area left clean and tidy.

  • 1st fix electrical completed and handed over.

  • 1st fix mechanical completed and handed over.

  • Any damages from 1st fix boarding.

  • Noggins/Ply fitted as marked by M/E trades.

  • Insulation installed as allowed/drawings.

  • Plaster board specifications checked to all walls.

  • Ceiling grid lines checked Screw centres checked.

  • Ceiling in cupboard complete.

  • Hallway to plot mastic checked.

  • Access panels cut to size ready to receive panels.

  • Cut outs for electrical boxes formed as marked by the concerned sub-contractor.

  • Ceiling void handed over as complete.

  • Plasterboard close up complete.

  • Board fixed to manufacture spec.

  • All window boards fixed.

  • All Area 100% completed

  • Area left clean and tidy ready for the next trade.

  • Select date

  • Add signature

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.