Access & Security Provision
-
Signing In - Are technical team and contractors signing in/out of the site?
-
Gates - Are the gates to the school fully functional and do they open and close correctly?
-
Are the locks/padlocks operational?
-
CCTV - All CCTV cameras are fully functional [as viewed on monitors] and moveable [as designed]
-
CCTV – Is the Image quality on TV monitors is clear
-
INTRUDER ALARM - Is the Intruder alarm equipment fully operational
-
SECURITY SERVICE SHEET - Service sheets for security equipment are available and completed correctly and legibly
-
Are System activations communicated to the Helpdesk?
-
System activations were investigated no more than 30 minutes after activation
-
After investigation, school buildings were left secure
WATER SYSTEMS & QUALITY
-
Check outlets around the school and check the water from taps is clear
-
Test a number of taps to check if they operate freely
-
Taps are free of drips
-
Are overflow pipes from toilets and tanks dry?
-
Tank and pipe insulation is in good condition
-
Are exposed pipe works free from condensation?
-
Pipe fittings do not leak
-
Is pipe work free from rust and/or contamination?
-
Is Main water supply stopcock to building clearly identified?
-
Water system is free of any unusual noise, such as water hammer
-
Water distribution system is free of leaks
SANITARY WARE, DRAINAGE & WASTE SYSTEMS
-
Walk the school grounds and check that no drains, sewers or gullies are blocked
-
Sanitary ware (wash hand basins, toilets, urinals) is in good condition and operates correctly and drains freely
-
Is the drainage system serviceable?
-
Drainage system is free of any noticeable leaks?
-
Drainage system is free of any unusual smells?
SWITCH / PLANT ROOMS, GENERATOR ROOMS, ELECTRICAL DISTRIBUTION BOARDS & GENERAL ELECTRICS
-
Are Switch, Plant & Generator rooms locked to unauthorised personnel?
-
Are Switch, Plant & Generator rooms clean and free of debris?
-
Do all Switch, Plant & Generator rooms have correct safety signage?
-
Are Electrical distribution boards are locked?
-
Are Electrical Sockets in good condition (no cracks, screws missing)?
LIGHTING
-
Internal & external lighting operates correctly regarding manual/ automatic switching?
-
Internal and external luminaires are clear of faulty lamps?
-
Internal and external luminaires are clean?
-
Internal and external luminaires are clear of any signs of deterioration?
-
External lighting columns are secured, clear of any corrosion & free of damage?
-
Defective lamps and tubes are stored safely before being removed from site and disposed of in an environmentally sensitive manner?
EMERGENCY LIGHTING
-
LED indicators are lit?
-
Emergency lights are fixed securely?
-
Diffusers are in good condition?
ENERGY MANAGEMENT EQUIPMENT
-
Heating Control Panel Switches are set at AUTO?
-
Heating Boilers are in good working order?
-
Variable & Constant Temperature pumps are working?
-
No Thermostatic Radiator Valves are missing?
-
The Heating Zone Override buttons are not regularly pressed (discuss with Janitor)?
LIFT EQUIPMENT
-
Alarm system & telephone are operational?
-
Up to date lift test certificates are available?
-
Lift emergency lighting functions correctly?
MAINTENANCE OF INTERNAL & EXTERNAL FINISHES
-
Internal & external walls are free from cracks and other defects?
-
Carpets are in good condition, firmly fixed and dry?
-
Floors are in good condition?
-
All internal paintwork is in fair condition?
-
Internal & external wall finishes are clean?
-
Gutters and down pipes are free from leaks – check at ground level?
-
Roofs are accessible safely to authorised personnel?
-
If safely accessible, roofs are free of debris?
-
If safely accessible, gutters are free of pooled water and debris?
-
Please upload any additional photographs relating to this audit.
-
Please complete signature box to finish audit.