Title Page
-
Site conducted
-
Audit Title
-
Project Name
-
Conducted on
-
Prepared by
-
Location
-
Instructions
-------------------
1. Answer "Checked" or "Hold" for the questions below, then identify the personnel who conducted the checking.
2. Add photos and notes by clicking on the paperclip icon.
3. To add a Corrective Measure click on the paperclip icon, then "Add Action", provide a description, assign to a member, set priority and due date.
4. Complete audit by providing digital signature.
5. Share your report by exporting as PDF, Word, Excel or Web Link
Aluminium Rainscreen
-
Main Contractor:
-
Project Number:
-
Issued to:
-
QA Sheet No:
-
Elevation:
-
Level:
-
Comments:
Delivery
-
Check the frame ref and size
- Checked
- Hold
-
Personnel
- Installer
- A2O
Clits and screw
-
Check correct clit and screws been use
-
Personnel
- Installer
- A2O
-
Check clits been used at max 600mm center
-
Personnel
- Installer
- A2O
Set out
-
Check window been installed correct to the grid off set
-
Personnel
-
Check window been installed to correct datum.
-
Personnel
Glazing
-
Check correct glazing, louver,panels been used
-
Personnel
-
Check opening sash was toe and heeled correctly
-
Personnel
-
Check correct size gasket was used for glazzing.
-
Personnel
- Installer
- A2O
Cill, handle and vent installation
-
Check cill was installed correctly
-
Personnel
- Installer
- A2O
-
Check handle and vent was installed correctly
-
Personnel
- Installer
- A2O
EPDM
-
Check the correct EPDM and Adhesive been used
-
Personnel
-
Check EPDM for any splits or holes
-
Personnel
Completion
-
Installer Signature:
-
A2O Signature:
-
Client Signature: