Title Page
-
Site conducted
-
Audit Title
-
Project Name
-
Conducted on
-
Prepared by
-
Location
-
Instructions
-------------------
1. Answer "Checked" or "Hold" for the questions below, then identify the personnel who conducted the checking.
2. Add photos and notes by clicking on the paperclip icon.
3. To add a Corrective Measure click on the paperclip icon, then "Add Action", provide a description, assign to a member, set priority and due date.
4. Complete audit by providing digital signature.
5. Share your report by exporting as PDF, Word, Excel or Web Link
Horizontal Siderise Firebarrier
-
Main Contractor:
-
Project Number:
-
Issued to:
-
QA Sheet No:
-
Elevation:
-
Level:
-
Comments:
Siderise fire barrier materials
-
Fire barrier schedule is available<br>within the site documentation
-
Personnel
- Installer
- A2O
-
Fire barrier materials have been<br>checked on delivery to site to be<br>correct type and specification in<br>accordance with the A2O fire barrier<br>schedule
-
Personnel
-
All fire barrier brackets, fixings and<br>tape has been delivered to site and<br>checked that they are in accordance<br>with the A2O fire barrier schedule<br>and manufacturers specification.
-
Personnel
Pre-installation
-
A site meeting with fire barrier<br>supplier [Tenmat] arranged and<br>carried out in advance of installation<br>works commencing. To include any<br>training that may be required.
-
Personnel
- Installer
- A2O
-
A2O Fire barrier construction<br>drawing are on site within the A2O<br>drawing file.
-
Personnel
- Installer
- A2O
-
All installation operatives have been<br>briefed on the specific installation of<br>the fire barriers to be installed, in<br>accordance with manufacturers<br>recommendation
-
Personnel
Fire barrier installation
-
Check fire barrier locations are in<br>accordance with A2O fire barrier<br>setting out construction drawings.
-
Personnel
- Installer
- A2O
-
At each barrier location, check that thickness of barrier is in accordance with cavity void plus 10 mm compression allowance in according with the manufacture speccification.
-
Personnel
- Installer
- A2O
-
Manually fold installation brackets to allow the correct embedment into the barrier. this need to be 75% of the depth of the barrier to insure a compression zone within each barrier.
-
Personnel
- Installer
- A2O
-
-
Check that barrier brackets are fixed max 500 mm centers with non combustible fixing, as per A2O fixing schedule.
-
Personnel
- Installer
- A2O
-
Ensure that the fire barrier is tightly<br>abutted to the barriers each side and sealed with sealant.
-
Personnel
- Installer
- A2O
-
Arrange inspection by Tenmat before commencing with any further cladding finishes.
Completion
-
Installer Signature:
-
A2O Signature:
-
Client Signature: