Pre-Installation
-
Has the BRE folder been complete and up to date?
-
Have the workers been trained and are competent?
-
Are the drawings in place and construction issue?
-
Has the material been stored in a dry and protected area?
Installation for NVFB
-
Have the fire barriers been installed to the correct locations as per the latest drawings?
-
Is the fire barrier in good condition and suitable to be installed onto the building?
-
Have the correct fixings been used as per the latest fixing schedule?
-
Have the fixing centres been maintained as per the manufactures guidelines?
-
Do the vertical fire barriers take precedence over the horizontal fire barriers?
-
Where the fire barrier has been interrupted by sub-grid, has a NVFB piece been installed to maintain the line of the fire barrier?
Installation for FF102
-
Have the fire barriers been installed to the correct locations as per the latest drawings?
-
Is the fire barrier in good condition and suitable to be installed onto the building?
-
Have the correct fixings been used as per the latest fixing schedule?
-
Have the fixing centres been maintained as per the manufactures guidelines?
-
Where the fire barrier has been interrupted by sub-grid, has a NVFB piece been installed to maintain the line of the fire barrier?