Title Page
-
Site conducted
-
Audit Title
-
Project Name
-
Conducted on
-
Prepared by
-
Location
-
Instructions
-------------------
1. Answer "Checked" or "Hold" for the questions below, then identify the personnel who conducted the checking.
2. Add photos and notes by clicking on the paperclip icon.
3. To add a Corrective Measure click on the paperclip icon, then "Add Action", provide a description, assign to a member, set priority and due date.
4. Complete audit by providing digital signature.
5. Share your report by exporting as PDF, Word, Excel or Web Link
Tenmat Firebarrier
-
Project Number:
-
Issued to:
-
QA Sheet No:
-
Elevation:
-
Level:
-
Comments:
Tenmat fire barrier materials
-
Fire barrier schedule is available<br>within the site documentation
-
Personnel
- Installer
- A2O
-
Fire barrier materials have been<br>checked on delivery to site to be<br>correct type and specification in<br>accordance with the A2O fire barrier<br>schedule
-
Personnel
-
Fire barrier materials have been<br>stored on site in an appropriate<br>manned in accordance with<br>manufacturers recommendation.
-
Personnel
-
All fire barrier brackets, fixings and<br>tape has been delivered to site and<br>checked that they are in accordance<br>with the A2O fire barrier schedule<br>and manufacturers specification.
-
Personnel
Pre-installation
-
A site meeting with fire barrier<br>supplier (Tenmat / Galaxy insulation) arranged and carried out in advance of installation works commencing. To include any training that may be required.
-
Personnel
- Installer
- A2O
-
A2O Fire barrier construction<br>drawings are on site within the A2O<br>drawing file.
-
Personnel
- Installer
- A2O
-
All installation operatives have been<br>briefed on the specific installation of<br>the fire barriers to be installed, in<br>accordance with manufacturers<br>recommendation
-
Personnel
Fire barrier installation
-
Check fire barrier locations are in<br>accordance with A2O fire barrier<br>setting out construction drawings.
-
Personnel
- Installer
- A2O
-
At each fire barrier location, check<br>that thickness of fire barrier is in<br>accordance with cavity void plus<br>compression allowance in<br>accordance with the manufacturers<br>specification.
-
Personnel
- Installer
- A2O
-
Bracket fixings are fixed at 500mm<br>centres with non combustible fixings<br>[no plastic or rubber washers].<br>Ensure fixings are as per A2O or<br>manufacturers specification.
-
Personnel
- Installer
- A2O
-
Ensure that the fire barrier is tightly<br>abutted to the barriers to each side and brackets do not stop compression of barrier.
-
Personnel
- Installer
- A2O
-
Fire mastic to seal any voids behind studs. Fire mastic to be approved by tenmat (rockwool firepro acoustic intu sealant)
-
Personnel
- Installer
- A2O
-
Bespoke items
Completion
-
Installer Signature:
-
A2O Signature:
-
Client Signature: