Title Page

  • Site conducted

  • Audit Title

  • Project Name

  • Conducted on

  • Prepared by

  • Location
  • Instructions
    -------------------
    1. Answer "Checked" or "Hold" for the questions below, then identify the personnel who conducted the checking.
    2. Add photos and notes by clicking on the paperclip icon.
    3. To add a Corrective Measure click on the paperclip icon, then "Add Action", provide a description, assign to a member, set priority and due date.
    4. Complete audit by providing digital signature.
    5. Share your report by exporting as PDF, Word, Excel or Web Link

Horizontal Siderise Firebarrier

  • Main Contractor:

  • Project Number:

  • Issued to:

  • QA Sheet No:

  • Elevation:

  • Level:

  • Comments:

Pre-installation

  • A site meeting with fire barrier<br>supplier [Tenmat] arranged and<br>carried out in advance of installation<br>works commencing. To include any<br>training that may be required.

  • Personnel

  • Fire barrier schedule is available within the site documents

  • A2O Fire barrier construction<br>drawing are on site within the A2O<br>drawing file.

undefined

  • All installation operatives have been<br>briefed on the specific installation of<br>the fire barriers to be installed, in<br>accordance with Tenmat<br>recommendation

  • Personnel

Fire barrier installation

  • Ensure that horizontal barriers are<br>installed after vertical barriers.

  • Personnel

  • Check fire barrier locations are in<br>accordance with A2O fire barrier<br>setting out construction drawings.

  • Personnel

  • At each fire barrier location, check<br>that thickness of fire barrier is in<br>accordance with cavity void and<br>allow a 25mm air flow gap between<br>the fire barrier front edge and the<br>rear face of the brick rail.

  • Personnel

  • Manually fold VFB installation<br>brackets 90 degrees at a point to<br>allow the correct embedment into<br>the fire barrier. This needs to be<br>long enough to allow the split end of<br>the bracket to protrude from the<br>barrier front face.

  • Personnel

  • VFB Bracket fixings are fixed at<br>max 500 centers with non<br>combustible fixings [no plastic or<br>rubber washers]. Ensure fixings are<br>as per A2O and manufacturers<br>specification.

  • Personnel

  • Ensure that the fire barrier is tightly<br>abutted to the barriers to each side<br>and seal with Intumescent Sealant

  • Personnel

  • Arrange inspection by Tenmat before commencing with any further cladding finishes.

Completion

  • Installer Signature:

  • A2O Signature:

  • Client Signature:

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.