Information
-
Document No.
-
Prepared by
Site Details
Site and Location Details
-
Client
-
Location Name
-
Location Address
-
Location Representitive
-
Date on Site
-
Time On Site
-
Time Off Site
Assets On Site
-
Total Number of units serviced
-
Serial / Asset Numbers
Outside Units
-
Have any OUTSIDE units been maintained during this service
-
No outside units were maintained during this service visit.
-
Type of service conducted
Quarterly Checks
-
The following service tasks were undertaken for a QUARTERLY service of the plant
-
Clean and check fans and motors
-
Lubricate fan bearing
-
Check motor fan pulleys and belts replace if required
-
Check duct connections
-
Check all wiring
-
Replace filter if required
-
Ensure all panels and doors are air tight
-
Check condense is free to run away
Half Yearly Checks
-
The following service tasks were undertaken for a HALF YEAR service of the plant
-
Clean and check fans and motors
-
Lubricate fan bearing
-
Check motor fan pulleys and belts replace if required
-
Check duct connections
-
Check all wiring
-
Replace filter if required
-
Ensure all panels and doors are air tight
-
Check condense is free to run away
-
Clean and examine coils
-
Check all visible pipe connections
-
Vent air from coils
-
Check all associated valves
-
Check all thermostats and sensors
Annual Checks
-
The following service tasks were undertaken for a full ANNUAL service of the plant
-
Clean and check fans and motors
-
Lubricate fan bearing
-
Check motor fan pulleys and belts replace if required
-
Check duct connections
-
Check all wiring
-
Replace filter if required
-
Ensure all panels and doors are air tight
-
Check condense is free to run away
-
Clean and examine coils
-
Check all visible pipe connections
-
Vent air from coils
-
Check all associated valves
-
Check all thermostats and sensors
-
Check battery fins
-
Wipe down casing
-
Service internal motor
-
Check anti vibration mountings
-
Check all casings and fixings are secure
-
Check bearings for wear
-
Lubricate motor slide rails
-
Clean eateranal and internal dirt from unit
-
Check paintwork for corrosion
-
Check all unit wiring inc gland terminals
-
insulation and earth continuity test completed
-
Check control panel for damage/overheating
-
Check circuit protection devices for correct ratings
-
Ensure mechanism of all contactors/relays are in tact
Indoor Units
-
Have any INDOOR units been maintained during this service
-
No indoor units were maintained during this service
-
Type of service conducted
Half Yearly Checks
-
The following service tasks were undertaken for the HALF YEARLY service of the plant
-
Clean filters by vacuuming of washing
-
Ensure condense free to run away
-
Check operation of condense pump
-
Wipe fascia of indoor unit
-
Check operation of cooling and heating modes
Annual Checks
-
The following service tasks were undertaken for the ANNUAL service of the plant
-
Clean filters by vacuuming of washing
-
Ensure condense free to run away
-
Check operation of condense pump
-
Wipe fascia of indoor unit
-
Check operation of cooling and heating modes
-
Examine wiring and connections
-
Inspect evaporators and condensers, brush clean
-
Check air on and off evaporators
-
Check air on and off condensers
-
FGAS cert completed
Quarterly Checks
-
The following service tasks were undertaken for the QUARTERLY service of the plant
-
Clean filters by vacuuming of washing
-
Ensure condense free to run away
-
Check operation of condense pump
-
Wipe fascia of indoor unit
Coments
Engineer Report and Comments
-
Engineers Report or Comments
Further Works
-
Are further works or remedial actions required following this visit.
-
No further actions or remedial works required
-
The following further actions should be considered for the equipment serviced
-
Further Actions
Sign Off
Location Representative Declaration
-
Please tick the following statements as conformation of completed works.
-
I confirm that the service as noted in this report was carried out
-
All immediate and further actions have been fully explained and detailed
-
The FGAS and Site Maintenance Records have been explained
-
Add signature
Elite Services Declaration
-
Please tick the following boxes as conformation of completed works
-
All site maintenance tasks completed
-
Site left clear and free of hazards
-
All equipment left operational and tested
-
All permits completed
-
Works discussed and agreed with site representative
-
Add signature