Information

  • Document No.

  • Prepared by

Site Details

Site and Location Details

  • Client

  • Location Name

  • Location Address
  • Location Representitive

  • Date on Site

  • Time On Site

  • Time Off Site

Assets On Site

  • Total Number of units serviced

  • Serial / Asset Numbers

Outside Units

  • Have any OUTSIDE units been maintained during this service

  • No outside units were maintained during this service visit.

  • Type of service conducted

Quarterly Checks

  • The following service tasks were undertaken for a QUARTERLY service of the plant

  • Clean and check fans and motors

  • Lubricate fan bearing

  • Check motor fan pulleys and belts replace if required

  • Check duct connections

  • Check all wiring

  • Replace filter if required

  • Ensure all panels and doors are air tight

  • Check condense is free to run away

Half Yearly Checks

  • The following service tasks were undertaken for a HALF YEAR service of the plant

  • Clean and check fans and motors

  • Lubricate fan bearing

  • Check motor fan pulleys and belts replace if required

  • Check duct connections

  • Check all wiring

  • Replace filter if required

  • Ensure all panels and doors are air tight

  • Check condense is free to run away

  • Clean and examine coils

  • Check all visible pipe connections

  • Vent air from coils

  • Check all associated valves

  • Check all thermostats and sensors

Annual Checks

  • The following service tasks were undertaken for a full ANNUAL service of the plant

  • Clean and check fans and motors

  • Lubricate fan bearing

  • Check motor fan pulleys and belts replace if required

  • Check duct connections

  • Check all wiring

  • Replace filter if required

  • Ensure all panels and doors are air tight

  • Check condense is free to run away

  • Clean and examine coils

  • Check all visible pipe connections

  • Vent air from coils

  • Check all associated valves

  • Check all thermostats and sensors

  • Check battery fins

  • Wipe down casing

  • Service internal motor

  • Check anti vibration mountings

  • Check all casings and fixings are secure

  • Check bearings for wear

  • Lubricate motor slide rails

  • Clean eateranal and internal dirt from unit

  • Check paintwork for corrosion

  • Check all unit wiring inc gland terminals

  • insulation and earth continuity test completed

  • Check control panel for damage/overheating

  • Check circuit protection devices for correct ratings

  • Ensure mechanism of all contactors/relays are in tact

Indoor Units

  • Have any INDOOR units been maintained during this service

  • No indoor units were maintained during this service

  • Type of service conducted

Half Yearly Checks

  • The following service tasks were undertaken for the HALF YEARLY service of the plant

  • Clean filters by vacuuming of washing

  • Ensure condense free to run away

  • Check operation of condense pump

  • Wipe fascia of indoor unit

  • Check operation of cooling and heating modes

Annual Checks

  • The following service tasks were undertaken for the ANNUAL service of the plant

  • Clean filters by vacuuming of washing

  • Ensure condense free to run away

  • Check operation of condense pump

  • Wipe fascia of indoor unit

  • Check operation of cooling and heating modes

  • Examine wiring and connections

  • Inspect evaporators and condensers, brush clean

  • Check air on and off evaporators

  • Check air on and off condensers

  • FGAS cert completed

Quarterly Checks

  • The following service tasks were undertaken for the QUARTERLY service of the plant

  • Clean filters by vacuuming of washing

  • Ensure condense free to run away

  • Check operation of condense pump

  • Wipe fascia of indoor unit

Coments

Engineer Report and Comments

  • Engineers Report or Comments

Further Works

  • Are further works or remedial actions required following this visit.

  • No further actions or remedial works required

  • The following further actions should be considered for the equipment serviced

  • Further Actions

Sign Off

Location Representative Declaration

  • Please tick the following statements as conformation of completed works.

  • I confirm that the service as noted in this report was carried out

  • All immediate and further actions have been fully explained and detailed

  • The FGAS and Site Maintenance Records have been explained

  • Add signature

Elite Services Declaration

  • Please tick the following boxes as conformation of completed works

  • All site maintenance tasks completed

  • Site left clear and free of hazards

  • All equipment left operational and tested

  • All permits completed

  • Works discussed and agreed with site representative

  • Add signature

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.