Title Page

  • Principle Contractor & Site Name

  • Date of Inspection

  • Location
  • Time on Site

  • Time off Site

  • Report Conducted By

1.0 Introduction

  • All scaffolds were inspected to measure compliance with the Work at Height Regulations 2005 (WAHR), various National Access and Scaffolding Confederation (NASC) guidance documents including TG20:13 & SG4:15, System Scaffold Manufacturer’s Instructions and any available design information. The scaffolds identified below were covered in the scope of this inspection, the location and any defects or matters that could give rise to a risk to health and safety are identified in each section (3.0 - Construction and workmanship of Scaffolds) of this report. This includes any corrective actions taken promptly by the scaffold inspector, as this assists with the identification of any recurring problem.

  • List of Scaffolds covered in this Inspection -

2.0 - Site Specific Documents

  • 2.1 - Which design configurations are applicable to the scaffolds constructed on site?

  • 2.1B - Do all completed/handed over design scaffolds have a "Working Design"

  • 2.1C Are all designed scaffolds erected in accordance with the supplied designs?

  • Observation:-
  • undefined

  • 2.1D - Have Compliance Sheets been issued to the client for all TG20:13 scaffolds erected and are they available on site?

  • 2.1E - Have the scaffolds on site been erected in accordance with the supplied TG20:13 compliance sheets.

  • 2.1F - Are the manufacturers instruction available on site and are they relevant to the system in use

  • 2.1G - What type of system scaffold is in use

  • 2.1H - Is the system scaffold erected in accordance with the manufacturer's instructions?

  • 2.1I - If not erected in accordance with the manufacturer's instructions is there a suitable bespoke design available or calculations available.

  • 2.3 - Has Anchor Testing been undertaken in accordance with TG4:19 and certificates been completed?

  • Additional Items?

  • Observation:-
  • undefined

3.0 - Construction and Workmanship of Scaffolds

  • 3.1 - Were standards adequately installed? (Consider level, joints, connections and spacing etc)

  • Observation:-
  • 3.2 - Were foundations adequate and suitable for the scaffolds observed? Have the correct sized sole boards been used for the ground conditions present

  • Observation:-
  • 3.3 - Were ledgers adequately installed? (Consider level, joints, connections and spacing etc)

  • Observation:-
  • 3.4 - Were transoms adequately installed? (Consider spacing, extension and connections etc)

  • Observation:-
  • 3.5 - Were couplers of the correct variety and used appropriately?

  • Observation:-
  • 3.6 - Was bracing installed correctly and in line with the design/TG20 compliance sheet/manufacturer's instructions provided?

  • Observation:-
  • 3.7 - Were scaffolds adequately tied or stabilised?

  • Observation:-
  • 3.8 - Were working platforms correctly boarded, boards of good quality and platforms of adequate dimension for the activities being undertaken?

  • Observation:-
  • 3.9 - Were guardrails adequately installed to all working platforms and set at the correct height?

  • Observation:-
  • 3.10 - Were toe boards adequately installed to all working platforms, correctly supported and in good condition?

  • Observation:-
  • 3.11 - Were Brickguards installed to all working platforms, if required by risk assessment?

  • Observation:-
  • 3.12 - Was netting/sheeting installed and in accordance with the specification of the design/compliance sheet?

  • Observation:-
  • 3.13 - Was access and egress to the scaffold safe, appropriate and without undue risk to scaffold users?

  • Observation:-
  • 3.14 - Were loading bays constructed in accordance with the provided design specification?

  • Observation:-
  • 3.15 - Were public protection measures required and were they in place and adequate?

  • Observation:-
  • 3.15 Additional Items?

  • Observation: -
  • undefined

Report Sign Off

  • Additional comments/notes

  • Inspection Completed by

  • Identified defects discussed with and copies of report issued to?

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.