Design Brief for Clients

  • Site conducted

  • Conducted on

  • Prepared by

  • Location

Scaffolding Design Brief

  • SCAFFOLD DESIGN BRIEF

  • Contract No.

  • Site Address
  • (inc. postcode)

  • Contract Name

  • Scaffold Brief No.

  • Signature of person

  • Person filling out this completing this request

  • Temporary Works Management Team

  • Position

  • Name

  • Tel No.

  • Company

  • Email

  • Site Contact

  • TW Coordinator

  • TW Designer

  • TW Design Checker

  • TW Supervisor

  • Contractor Supplying / Installing Temporary Works Scheme

  • Company

  • Contact Name

  • Tel No.

  • Email

  • SCOPE OF USE (Identify trades and activities the scaffold will be used for)

  • Details of work to be carried out from scaffold

  • Single or Multi Trade usage

  • Preferred Scaffold System

  • Scaffold Erection Sequence

  • - Progressively as works advance.

  • - Completely before use.

  • Scaffold Dismantle Sequence

  • - Progressively allowing trades to complete works as scaffold is dismantled.

  • - Completely.

  • Scaffold Erection Date

  • Scaffold Dismantle Date

  • DESIGNATION / LOADINGS / LAYOUT (Description of scaffold and dimensions)

  • Minimum Platform loading (kN/m2) and / or details of loadings applied

  • No. of platform boards: (Between Standards)

  • No. of inside boards: (Between inside standard & structure)

  • Ref: ScaffSafe Design

  • Issue: 1

  • Date: June 2024

  • Page 1 of 5

  • SCAFFSAFE

  • Boards required in window reveals

  • Fully boarded scaffold

  • Detail number of boarded lifts required at any one time if not fully boarded scaffold

  • Number of loaded platforms

  • Platform Lift Height: (meters)

  • Ledger bracing omitted at the working level

  • Hop-up platform requirements

  • Number of Loading bays: (NASC SG33)

  • Required Loading bay loadings: (kN/m2)

  • Loading bays loaded / unloaded by

  • Loading bays single or multi-level

  • Point loading (e.g. wheel loads, hoist run off platforms)

  • Covering of 50mm gap between platform boards and inside boards

  • Note: required for:

  • Interface between the loading bay and scaffold platform

  • Above walkways / access routes through the scaffold

  • Scaffolds with more than one working lift

  • Service gap dimensions (Note: greater than 225mm will require additional fall prevention measures)

  • Internal edge protection requirements (NASC SG29)

  • Other: please detail

  • FOUNDATIONS

  • Description of foundations including any loading restrictions / requirements

  • Soil

  • Concrete

  • Existing Structure

  • Tarmac

  • Flag Stone

  • Other (please detail)

  • Max Ground / Base Bearing Pressure (Note: ensure loading unit and scaffold leg loading units are the same)

  • Special Leg load spreading requirements

  • Back propping requirements

  • STABILITY

  • Identify how the scaffold will be secured to the structure and any structure loading / sequence restrictions

  • Buttress

  • Guy Ropes

  • Kentledge

  • Physical Ties (through, box, reveal, etc.)

  • Drilled Anchor (NASC TG4)

  • Screwed Anchor (NASC TG4)

  • Health Safety Made Simple.

  • SCAFFSAFE

  • LIMITED

  • Chemical Anchor (NASC TG4)

  • Free Standing

  • Ground Anchor (NASC TG16)

  • Butted off Structure

  • Other (please detail)

  • ---

  • Base structure and restrictions:

  • Note: Ensure proposed tie / securing solution is suitable for the supporting structure (i.e. can you install scaffold prior to concrete or deck install)?

  • ---

  • ROOFING / SCAFFOLD COVERS (Identify where scaffolding is required for roofing / cover issues) (NASC TG18)

  • Preferred System:

  • Unit Beams

  • System

  • Preferred Covering:

  • Kadar Sheet

  • Shrink Wrap

  • Preferred Erection Method:

  • Crane

  • Roll out track

  • By hand if above are not practicable.

  • Preferred Ridge angle of roof: (degrees)

  • Note: See notes in Sheeting / Brick Guards Section.

  • ---

  • SHEETING / BRICK GUARDS (Identify if sheeting / brickguards are required)

  • Monarflex

  • Debris Netting

  • Shrink Wrap

  • Brick Guards (NASC SG10)

  • Other (please detail)

  • Installation / Removal sequence:

  • (progressive / complete)

  • Note: Flame retardant flexible coverings complying with the Loss Prevention Standard LPS1215 or equivalent must be selected.

  • Overprinting on the flexible covering must not detrimentally affect its fire performance. Written confirmation of testing must be obtained from the supplier before use.

  • Third party approved flexible covering materials must be used on all parts of the project, including scaffold cladding, containment nets, temporary roof sheeting and other tarpaulins. Non-approved materials must not be used on different parts of the building.

  • ---

  • ACCESS REQUIREMENTS (Identify scaffold access requirements - detailed below in order of preference) (NASC SG25)

  • Staircase:

  • (External scaffold or permanent building staircase)

  • Ladder access bays:

  • (single lift ladders with protected ladder trap)

  • Ladder access bays:

  • (multiple lift ladders with protected ladder trap).

  • Internal ladder access:

  • (with protected ladder trap).

  • External ladder access:

  • (safety gate restricted to a 2-lift high scaffold).

  • Other: (please detail)

  • ---

  • Ref: ScaffSafe Design

  • Issue: 1

  • Date: June 2024

  • Brief

  • Page 3 of 5

  • Health Safety Made Simple.

  • ADDITIONAL ITEMS

  • Identify any additional items required on the scaffolding:

  • Bridged Area

  • Pallet Gates

  • Gin Wheels

  • Pavement Lift (NASC SG34)

  • Pavement Gantry (NASC SG34)

  • Truss out Scaffolds

  • Edge Protection / Guardrails (NASC SG27)

  • Hoists (NASC SG26)

  • Hoist Runoff Platform

  • Debris / Waste Chutes (NASC TG3)

  • Lighting

  • Earthing (NASC SG5)

  • Fire Retardant Boards (NASC TG10)

  • Tying Down of Boards (NASC TG12)

  • Non-Standard Boarding (NASC TG13)

  • Running Rails / Lifting Beams

  • Ramps

  • Protective Fan(s) (detail type, no.of, lift position, protection against)

  • Other (please detail)

  • Install / Removal sequence of additional items:

  • SITE SPECIFIC RISKS THAT MAY AFFECT THE ERECTION OF THE SCAFFOLDING

  • Identify any other issues that may affect the erection of the scaffolding:

  • Pavement Licenses (NASC CG1)

  • Overhead Power Sources (NASC SG5)

  • Restricted Access

  • Restrictions from Adjacent Structures

  • Fragile Roofs

  • Loading / Unloading Sequence

  • External Signage

  • Asbestos (NASC SG2)

  • Rail / Air / Highway restrictions

  • Other (please detail)

  • DESIGN / DESIGN CHECK REQUIREMENTS

  • Detail expected design requirements:

  • Temporary Works Design Category:

  • 0

  • 1

  • 2

  • 3

  • Date Required

  • Date required

  • Outline Sketches

  • Erection Checklist

  • Full Working Drawings

  • Manufacturers Information

  • Calculations

  • NASC Compliance Sheet

  • Design Check

  • Tie Tech / User Instructions

  • Design Check Cert.

  • Other (Please detail in Additional Outline Method Statement Information Section)

  • Inspection / Testing Requirements

  • Detail the testing / inspection regime required:

  • Prior to first use (NASC SG35)

  • Statutory inspections (not exceeding 7 days)

  • Ref: ScaffSafe Design

  • Issue: 1

  • Date: June 2024

  • Brief

  • Page 4 of 5

  • SCAFFSAFE LIMITED

  • Preliminary tie testing

  • Installed Tie testing (NASC TG4)

  • Designer inspection prior to first use

  • Other (please detail)

  • Supporting Information (Detail supporting information supplied with this design brief)

  • Build Sequence Information

  • Site Plan

  • Permanent Work Elevations

  • Permanent Works Structural Information

  • Design / Loading Limitations

  • Access Limitations / Restrictions

  • CBR / Plate Loading Test Data

  • Photographs / Drawings

  • Details of Existing Services

  • Client Scaffold Specification

  • Scaffold Access Location Drawing

  • Other (Please detail in Additional Information Section)

  • Mandatory Information to be Supplied

  • ADDITIONAL INFORMATION

  • Note 1: If there are sections that you are unable to complete, please liaise with the Scaffold Designer / Contractor who will advise of the required information

  • Note 2: NASC references refer to the latest published edition available at:

  • National Access and Scaffolding Confederation

  • Ref: ScaffSafe Design

  • Issue: 1

  • Date: June 2024

  • Page 5 of 5

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.