Title Page
-
Document No.
-
Audit Title
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Personnel
-
Has a pre-planning meeting been conducted before assembly?
-
Has a pre-start inspection been conducted on the crane?
-
Is there adequate room for the crane?
-
Is the crane located a safe distance away from excavations?
-
Has the SWMS been read and signed by workers conducting the work?
-
Does the crane operator and dogman have their tickets on them?
-
Does the crane operator know the weight of the lift?
-
Has a lift study been conducted and is it being used?
-
Did the crane operator do a dry run before lifting?
-
Is the lifting equipment appropriate for the load being lifted?
-
Are counterweights used as required by the customer or client?
-
If the crane is set up near a road, has traffic management been considered?
-
Has over head hazards been considered such as power lines?
-
If overhead power lines are present, is a certified spotter being used?
-
Is the spotter focussing on the task at hand and not distracted ?
-
Has the crane been set up on a stable site?
-
Has the weather conditions been considered ?
-
Is site base compacted and stable?
-
Are the outriggers out and in place and the wheels lifted?
-
Is the crane the right size for the job?
-
Has adequate barricading or fencing been supplied for public access?
-
Has an exclusion zone been selected for around the crane?
-
Is there radio contact with the crane operator and work crew?
-
Are the workers wearing their PPE?
-
Are other workers moving around or under lifts or within exclusion zones?
-
Is there adequate lighting if work is being done at night or in low light conditions?
-
Is the cabin of the crane tidy, no rubbish laying around?
-
Is the immediate area around the crane tidy and clean?
-
Add signature